My WebLink
|
Help
|
About
|
Sign Out
Home
Finance Highlights 2015 0317
CityHall
>
City Clerk
>
City Council
>
Committees
>
Finance Committee
>
Finance Highlights 2015 0317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2015 9:41:54 AM
Creation date
4/29/2015 9:39:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/17/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0504 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0504
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3 <br />member organizations whose names are subscribed hereto and who have through their <br />officers executed this Agreement. <br />1.14 "Project Manager"means the person or persons or business entity designated by the <br />City to oversee all phases of construction on the Projects. <br />1.15 "Schedule A Agreement"means the local master labor agreement of a Union signatory <br />to this Agreement and which is listed in Appendix A. <br />ARTICLE 2 <br />SCOPE OF AGREEMENT <br />2.1 Parties:This Agreement shall apply and is limited to all Contractors and <br />Subcontractors performing Construction Contracts necessary for the Projects,the City,the <br />Council and any labor organization signatory to this Agreement,acting in their own behalf <br />and on behalf of their respective affiliates and member organizations whose names are <br />subscribed hereto and who have through their officers executed this Agreement. <br />2.2 Project Description:This Agreement shall apply to the award of all of the Construction <br />Contracts identified by the City as part of the Projects.The City has the absolute right to <br />combine,change,consolidate,suspend or cancel Construction Contract(s)or portions of <br />Construction Contract(s)identified as part of the Projects.Should the City suspend or <br />remove any contract from the Projects and thereafter authorize that construction work be <br />commenced on such contract,then such contract shall be performed under the terms of this <br />Agreement.Once a Construction Contract is completed it is no longer covered by this <br />Agreement except when a Contractor is directed to engage in repairs,warranty work or <br />modifications required by its Construction Contract with the City. <br />2.3 Coveredwork: <br />2.3.1 (a) This Agreement covers, without limitation, all on-site construction, demolition, <br />alteration, painting or repair of buildings, structures, rights-of-way, landscaping, temporary <br />fencing, temporary HVAC works and other works and related activities for the Projects that is <br />within the craft jurisdiction of one of the Unions and that is part of the Projects, including, <br />without limitation, pipelines,site preparation, survey work, demolition of existing structures and all <br />construction,demolition or improvements required to be performed as a condition of approval by <br />any public agency. This scope of work includes all soils and materials testing and inspection where <br />such testing and inspection is a classification in which a prevailing wage determination is <br />published. <br />(b) This Agreement shall apply to any start-up, calibration, performance testing, repair, <br />maintenance, operational revisions to systems and/or subsystems performed after Completion <br />unless it is a new contract and falls below the threshold identified in section 1.12, or is <br />performed by City Employees.
The URL can be used to link to this page
Your browser does not support the video tag.