Laserfiche WebLink
Capital Project Update <br />27 <br />Capital Project Update <br />printed April 7, 2015 <br />Allocation and <br />Planned <br />Item <br />Description <br />Funding Source <br />Status <br />Completion <br />Bicycle Network East <br />5400,000 <br />Install striping and signage for bicycles on portion of <br />21 <br />network east of BART tracks. <br />Measure B B&P <br />Bid and Award <br />Fall 20 15 <br />31 <br />Revise window construction to eliminate water intros ion. <br />$120,1300 <br />Construction <br />Winter 2G14-15 <br />Fiber Loop: Separation City Hall to blain Library <br />$515,WO <br />Add a second fnberconduit: between these locationsto <br />General Fund <br />22 <br />create a redundaniValte nate data path_ <br />DFSI <br />Bid and Award <br />Fall 2015 <br />Sanitary Sewer point repair 2612-13 and 2013-14 <br />$1,WB,000 <br />Repair existing sanitary sewer pipes at various location <br />Measure B B&P <br />23 <br />throughout the City. <br />WPCP enterprise fund <br />Bid & Award <br />Fall 2015 <br />33 <br />Storm Drain Dutfall Repair <br />$50,0010 <br />Construction <br />Summer 2015 <br />Repair storm drain outfalls; at Cary Ave, Glen Drive, <br />$51,00O,ouu <br />24 <br />MacArthur Blvd, and Monarch Bay Drive. <br />Measure B LSR <br />Bid and Award <br />Fall 2015 <br />34 <br />Pollution Control Plant <br />$11313,000 <br />Construction <br />Summer 201S <br />Stenzel Park Bleachers <br />58GO,WO <br />25 <br />Replace baseball bleachers at Stenzel Park <br />WW grant <br />Procurement <br />Summer 2015 <br />Annual Street Overlay/Rehab 2013-14 <br />$30,000' <br />35 <br />Downtown Garage Electric vehicle charging <br />Grant <br />Construction <br />Complete <br />26 <br />Install vehicle charging stations at Downtown Garage <br />RDA Successor Agency <br />Construction <br />Spring 2015 <br />Bled <br />$60,000' <br />Downtown Garage Signage <br />Gas tax <br />27 <br />Install neon signs at Downtown Garage <br />RDA Successor Agency <br />Construction <br />Spring 2015 <br />52,600,000 <br />Fiber Conduit for Broadband Network <br />EDA Grant <br />Install approximately 32,ou0 feet of conduit in support of <br />DFSI <br />28 <br />LIT SL project <br />General Fund <br />Construction <br />Spring 2015 <br />$360,000 <br />HesperianI Springlike / Railroad Im pmuements <br />Grant (section 130) <br />29 <br />1 Modify signal and sidewalk to improve pedestrian safety <br />Measure B B&P <br />Construction <br />ISpring 2015 <br />$600,000 <br />Replace HVAC fan and coil at Police Dept. <br />Extend life of existing HVAC system for Police Dept. <br />Building Maintenance <br />30 <br />building byreplacing worn parts <br />Fund <br />Construction <br />Spring 2015 <br />27 <br />Capital Project Update <br />printed April 7, 2015 <br />AlFocation and <br />planned <br />Item <br />Description <br />Fu nd ing Source <br />Status <br />Completion <br />$125,000 <br />Replace smrefront windows at Marina Community <br />Center <br />Building Maintenance <br />31 <br />Revise window construction to eliminate water intros ion. <br />Fund <br />Construction <br />Winter 2G14-15 <br />San Leandro Ballpark Restroom <br />$515,WO <br />Enlarge public restrooms to meet ADA by reducing size of <br />32 <br />team locker rooms_ <br />WW grant <br />Construction <br />Spring 2015 <br />$455,WO <br />Sidewalk Program 2014-15 <br />Measure B B&P <br />Replace damaged portions of existing sidewalk,install <br />TDAgrant <br />33 <br />ADA curb ramps. <br />CDBG <br />Construction <br />Summer 2015 <br />WPCP Rehabilitation <br />$51,00O,ouu <br />Replace worn facilities to improve redundencyat Water <br />34 <br />Pollution Control Plant <br />WPCP emerprise fund <br />Construction <br />Summer 201S <br />58GO,WO <br />Measure B LSR <br />Annual Street Overlay/Rehab 2013-14 <br />VRF <br />35 <br />Street surface replacement Bigge, Bancroft <br />Gas. Tax <br />Construction <br />Complete <br />BART -Downtown Pedestrian Improvements San Leandro <br />56,600,000 <br />Bled <br />Federal Grant <br />Streetscape improvements aFong San Le,andm Boulevard <br />Gas tax <br />36 <br />between Davis Street and Williams Street <br />Measure B B&P and -SR <br />Construction <br />Complete <br />$455,1100 <br />Sidewalk Program ZG13-14 <br />Measure B <br />Replace damaged portions of existing sidewalk,install <br />TDAgrant <br />37 <br />ADA curb ramps. <br />CDBG <br />Complete <br />Complete <br />' indicates project cost and not allocation <br />27 <br />