My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2015 0601
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0601
>
10A Action 2015 0601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:58:48 AM
Creation date
5/27/2015 5:58:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/1/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0601 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0601
PowerPoint 10A Action 2015 0601 Downtown Area Projects
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0601
Reso 2015-102
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-253 <br />Analysis <br />A total of 3 bids were received on April 20, 2015 ranging from $762,800.00 to $845,665.00. <br />McGuire and Hester submitted the lowest responsive Base Bid at $762,800.00. The <br />engineer's estimate for construction was $548,113.00. Therefore, after award, the City will <br />reduce the construction cost by $102,950.00 by deleting new street lights from the work <br />reducing the construction cost to $659,850.00 to bring the project within budget. <br />Previous Actions <br />• On September 14, 2014 by Resolution No. 2014-100, the City Council authorized the City <br />Manager's Execution of a Grant Funding Agreement for Transportation Fund for Clean Air <br />(TFCA) funding and the City's commitment to install bicycle lockers at the San Leandro <br />BART station. <br />• On October 7, 2013 by Resolution No. 2013-131, the City Council made a commitment to <br />the grant terms, approved a project status report, and requested Regional Measure 2 <br />(RM2) grant funds for the design phase of this project. <br />• On June 17, 2013 by Resolution No. 2013-087, the City Council authorized the City <br />Manager's Execution of a Grant Funding Agreement for Measure B Funding, Committing <br />the City to Spend the Necessary Matching Funds and Providing City Assurance to <br />Complete the West Juana Pedestrian Improvements Project. <br />• On April 20, 2015 by Resolution No. 2015-171, the City Council requested RM2 grant <br />funds for the construction phase of this project. <br />Applicable General Plan Policies <br />This action is consistent with Transportation Goal No. 14 of the General Plan and Action Item <br />14.07: Pedestrian Environment. <br />Environmental Review <br />This project was deemed categorically exempt from CEQA per Section 15301(c) - Existing <br />Facilities. A Notice of Exemption was filed with the County Recorder on August 21, 2014. <br />Summary of Public Outreach Efforts <br />This project was advertised on March 20, 2015 in the Daily Review as well as in three other <br />newspapers whose circulation reflects the diversity of San Leandro. Staff also notified <br />contractors interested in working with the City via email and sent plans to fifteen plan rooms. <br />The contractor will provide notification in the form of door hangers to properties adjacent to <br />the project immediately before the work begins. <br />Fiscal Impacts <br />City of San Leandro Page 2 Printed on 5127/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.