BID SUMMARY
<br />Jj{{.a.. ✓"<� 5�...=. V�{L � �' i„aftYd°+�lfld�!Q
<br />PROJECT TITLE: West Juana Avenue Pedestrian Improvements
<br />PROJECT NO.: 2014.0500
<br />BID NO.: 14-15.023
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />McGuire and Hester
<br />Sposeto Engineering Inc.
<br />CF Contracting Inc.
<br />DATE: Monday, April 20, 2015
<br />Date Approved: 3/17/15
<br />9009 Railroad Avenue
<br />4558 Contractors Place
<br />2525 Van Ness Avenue, # 210
<br />TIME: 3:00 p.m.
<br />Prepared by: N. Thom
<br />Oakland, CA 94603
<br />Livermore, CA 94551
<br />San Francisco, CA 94109
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 632-7676
<br />Phone: (925) 443-4200
<br />Phone: (415) 721-7160
<br />Fax: (510) 562-5209
<br />Fax: (925) 443-6800
<br />Fax: (415) 296-6437
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />16
<br />Curb inlet per drawing 204 case
<br />8 EA
<br />$3,500.00
<br />$28,000.00
<br />$6,000.00
<br />$48,000.00
<br />$4,000.00
<br />$32,000.00
<br />$2,500.00
<br />$20,000.00
<br />3101
<br />17
<br />Furnish and install tree grate per
<br />1 EA
<br />$2,500.00
<br />$2,500.00
<br />$1,600.00
<br />$1,600.00
<br />$2,500.00
<br />$2,500.00
<br />$1,500.00
<br />$1,500.00
<br />drawing 438A and 438B case
<br />3101
<br />18
<br />County SDMH per detail SD 405
<br />6 EA
<br />$6,000.00
<br />$36,000.00
<br />$12,000.00
<br />$72,000.00
<br />$7,200.00
<br />$43,200.00
<br />$7,500.00
<br />$45,000.00
<br />and SD 409
<br />19
<br />Pothole utilities per section 306-0
<br />3 EA
<br />$800.00
<br />$2,400.00
<br />$1,250.00
<br />$3,750.00
<br />$580.00
<br />$1,740.00
<br />$500.00
<br />$1,500.00
<br />20
<br />Trash capture screen per section
<br />8 EA
<br />$600.00
<br />$4,800.00
<br />$900.00
<br />$7,200.00
<br />$650.00
<br />$5,200.00
<br />$1,500.00
<br />$12,000.00
<br />304-5
<br />21
<br />Sheeting, Shoring, and Bracing
<br />1 LS
<br />$2,000.00
<br />$2,000.00
<br />$1,000.00
<br />$1,000.00
<br />$12,000.00
<br />$12,000.00
<br />$50,000.00
<br />$50,000.00
<br />per section 306-1.1.6
<br />22
<br />Temporary Pedestrian Facilities
<br />1 LS
<br />$15,000.00
<br />$15,000.00
<br />$8,000.00
<br />$8,000.00
<br />$9,600.00
<br />$9,600.00
<br />$2,500.00
<br />$2,500.00
<br />at Carpentier per section 7-
<br />10.1.1
<br />23
<br />Relocate existing street light
<br />1 EA
<br />$1,000.00
<br />$1,000.00
<br />$3,000.00
<br />$3,000.00
<br />$3,800.00
<br />$3,800.00
<br />$2,000.00
<br />$2,000.00
<br />including connection per section
<br />307
<br />24
<br />Furnish and install street lights
<br />7 EA
<br />$6,000.00
<br />$42,000.00
<br />$13,500.00
<br />$94,500.00
<br />$16,900.00
<br />$118,300.00
<br />$5,000.00
<br />$35,000.00
<br />per section 307
<br />TOTAL BASE BID: $548,113.00
<br />$762,800.00
<br />$804,247.80 ""
<br />$845,665.00 `*
<br />SUBCONTRACTORS:
<br />Asphalt Impressions
<br />Bayside Striping & Sign
<br />Pascual Diaz Construction
<br />Columbia Electric
<br />United Storm Water, Inc.
<br />On The Level Concrete
<br />Cook Engineering
<br />Cook Engineering
<br />Columbia Electric
<br />Compass Engineering
<br />West Juana Ave. Pedestrian Improvements Page 2 of 3 Printed 4/20/2015 @ 4:56 PM