Laserfiche WebLink
BID SUMMARY <br />Jj{{.a.. ✓"<� 5�...=. V�{L � �' i„aftYd°+�lfld�!Q <br />PROJECT TITLE: West Juana Avenue Pedestrian Improvements <br />PROJECT NO.: 2014.0500 <br />BID NO.: 14-15.023 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />McGuire and Hester <br />Sposeto Engineering Inc. <br />CF Contracting Inc. <br />DATE: Monday, April 20, 2015 <br />Date Approved: 3/17/15 <br />9009 Railroad Avenue <br />4558 Contractors Place <br />2525 Van Ness Avenue, # 210 <br />TIME: 3:00 p.m. <br />Prepared by: N. Thom <br />Oakland, CA 94603 <br />Livermore, CA 94551 <br />San Francisco, CA 94109 <br />LOCATION: City Clerk's Office <br />Phone: (510) 632-7676 <br />Phone: (925) 443-4200 <br />Phone: (415) 721-7160 <br />Fax: (510) 562-5209 <br />Fax: (925) 443-6800 <br />Fax: (415) 296-6437 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />16 <br />Curb inlet per drawing 204 case <br />8 EA <br />$3,500.00 <br />$28,000.00 <br />$6,000.00 <br />$48,000.00 <br />$4,000.00 <br />$32,000.00 <br />$2,500.00 <br />$20,000.00 <br />3101 <br />17 <br />Furnish and install tree grate per <br />1 EA <br />$2,500.00 <br />$2,500.00 <br />$1,600.00 <br />$1,600.00 <br />$2,500.00 <br />$2,500.00 <br />$1,500.00 <br />$1,500.00 <br />drawing 438A and 438B case <br />3101 <br />18 <br />County SDMH per detail SD 405 <br />6 EA <br />$6,000.00 <br />$36,000.00 <br />$12,000.00 <br />$72,000.00 <br />$7,200.00 <br />$43,200.00 <br />$7,500.00 <br />$45,000.00 <br />and SD 409 <br />19 <br />Pothole utilities per section 306-0 <br />3 EA <br />$800.00 <br />$2,400.00 <br />$1,250.00 <br />$3,750.00 <br />$580.00 <br />$1,740.00 <br />$500.00 <br />$1,500.00 <br />20 <br />Trash capture screen per section <br />8 EA <br />$600.00 <br />$4,800.00 <br />$900.00 <br />$7,200.00 <br />$650.00 <br />$5,200.00 <br />$1,500.00 <br />$12,000.00 <br />304-5 <br />21 <br />Sheeting, Shoring, and Bracing <br />1 LS <br />$2,000.00 <br />$2,000.00 <br />$1,000.00 <br />$1,000.00 <br />$12,000.00 <br />$12,000.00 <br />$50,000.00 <br />$50,000.00 <br />per section 306-1.1.6 <br />22 <br />Temporary Pedestrian Facilities <br />1 LS <br />$15,000.00 <br />$15,000.00 <br />$8,000.00 <br />$8,000.00 <br />$9,600.00 <br />$9,600.00 <br />$2,500.00 <br />$2,500.00 <br />at Carpentier per section 7- <br />10.1.1 <br />23 <br />Relocate existing street light <br />1 EA <br />$1,000.00 <br />$1,000.00 <br />$3,000.00 <br />$3,000.00 <br />$3,800.00 <br />$3,800.00 <br />$2,000.00 <br />$2,000.00 <br />including connection per section <br />307 <br />24 <br />Furnish and install street lights <br />7 EA <br />$6,000.00 <br />$42,000.00 <br />$13,500.00 <br />$94,500.00 <br />$16,900.00 <br />$118,300.00 <br />$5,000.00 <br />$35,000.00 <br />per section 307 <br />TOTAL BASE BID: $548,113.00 <br />$762,800.00 <br />$804,247.80 "" <br />$845,665.00 `* <br />SUBCONTRACTORS: <br />Asphalt Impressions <br />Bayside Striping & Sign <br />Pascual Diaz Construction <br />Columbia Electric <br />United Storm Water, Inc. <br />On The Level Concrete <br />Cook Engineering <br />Cook Engineering <br />Columbia Electric <br />Compass Engineering <br />West Juana Ave. Pedestrian Improvements Page 2 of 3 Printed 4/20/2015 @ 4:56 PM <br />