My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2015 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0615
>
8E Consent 2015 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 12:05:06 PM
Creation date
6/10/2015 2:45:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/15/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0615 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0615
Reso 2015-106
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-304 <br />the City Council is required. <br />The construction contract was awarded for $242,634. The major increased scope of work for <br />the two interior walls and two exterior walls is estimated to cost 30% of the contract price. The <br />cost of all minor extra work to account for unforeseen conditions is projected to be 10% of the <br />original contract price. The minor extra work includes adding trap primers to two existing floor <br />drains and capping the other two existing floor drains per Building Code; replacing two leaky <br />existing water shutoffs in the mechanic room; and additional demo and patch work of concrete <br />slab due to unforeseen conditions in the plumbing walls. <br />The total construction cost is projected at $339,700 requiring a change order amount of 40%. <br />Previous Actions <br />On September 2, 2014, by Resolution No. 2014-116, the City Council awarded a construction <br />contract to Southland Construction for the San Leandro Ball Park Lockers/Restrooms <br />Refurbishment project. <br />Permits and/or Variances Granted <br />A City of San Leandro Building Permit was obtained for this work. <br />Environmental Review <br />This project is categorically exempt from CEQA per Section 15301(c) - Existing Facilities. A <br />CEQA Categorical Exemption for this project was filed with Alameda County on March 26, <br />2010. <br />Code Compliance Review <br />A City of San Leandro Building Permit was obtained for this project under the 2013 San <br />Leandro Building Code based on the 2012 International Building Code. <br />Fiscal Impacts <br />Total project cost is anticipated to be $515,000 including design, construction management, <br />inspection, and construction contingencies. <br />Budget Authority <br />This project is fully funded by existing appropriation of WW Grant Funds in CIP account <br />150-62-110 in the amount of $515,452. <br />ATTACHMENT <br />None. <br />PREPARED BY: Ingrid Lin, Assistant Engineer, Engineering and Transportation Department <br />Page 2 City of San Leandro Printed on 6/9/2015
The URL can be used to link to this page
Your browser does not support the video tag.