My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2015 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0615
>
8G Consent 2015 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:24:24 AM
Creation date
6/10/2015 2:45:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/15/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0615 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0615
Reso 2015-108
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-279 <br />at Wicks Boulevard at the Marina Community Center. These units are activated with a manual <br />push button that energizes the beacons. Additionally, speed feedback signs will be installed <br />on Lake Chabot Road, which will display vehicle speeds with large bright LED numbers as the <br />vehicles approach to alert motorists of their speed. <br />Analysis <br />A total of four bids were received on May 12, 2015 ranging from $371,000.00 to $683,381.00. <br />Ray's Electric submitted the lowest responsive Base Bid at $371,000.00. The pre-bid <br />engineer's estimate for construction was $285,607.00. <br />Previous Actions <br />On October 21, 2013, the City Council adopted a resolution that established a San Leandro <br />Title VI program, which was a requirement to receive Cycle 4 New Freedom grant funds from <br />the FTA. <br />Committee Review and Actions <br />The project was reviewed and supported by the City Council Facilities and Transportation <br />Committee on October 10, 2012. <br />Applicable General Plan Policies <br />This action is consistent with Transportation Goal No. 14 of the General Plan and Action Item <br />14.07: Pedestrian Environment. <br />Permits and/or Variances Granted <br />Two encroachment permits are pending, including one from Caltrans for the APS and <br />accessible ramp improvements at seven signalized intersections on East 14th Street, and one <br />from the County of Alameda Public Works Agency for the APS and accessible ramps <br />improvements at two signalized intersections on East 14th Street at Fairmont Drive and at <br />Bayfair Drive. <br />Environmental Review <br />This project was deemed categorically exempt from CEQA per Section 15301(c) - Existing <br />Facilities. A Notice of Exemption was filed with the County Recorder on May 5, 2015. <br />Board/Commission Review and Actions <br />The project was reviewed and supported by the San Leandro Bicycle and Pedestrian Advisory <br />Committee (BPAC) on February 22, 2012. <br />Summary of Public Outreach Efforts <br />This project was advertised in the Daily Review as well as in three other newspapers whose <br />City of San Leandro Page 2 Printed on 6/9/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.