<br />PROJECT TITLE: APS Upgrade 2012
<br />PROJECT NO.: 2012.0220
<br />BID NO.: 14-15.019
<br />BID SUMMARY
<br />Phis document is a summary of bids received for the subject project and are
<br />)rovided only as a convenience. Listing of a particular bid is not a finding that
<br />;uch bid has been found to be responsive or accepted as complete by the City.
<br />kn award of contract, if any, is subject to approval of the City Council and/or the
<br />'.ity Manager. Contractors should refer to the contract documents forbidding
<br />nformation.
<br />BID OPENING
<br />DATE: Tuesday, May 12, 2015
<br />TIME: 2:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 5/6/2015
<br />Prepared by: N. Castelino,
<br />RL Chen
<br />Ray's Electric
<br />411 Pendleton Way, Suite B
<br />Oakland, CA 94621
<br />Phone: (510) 577-7700
<br />Fax: (510) 577-7706
<br />St. Francis Electric, Inc.
<br />975 Carden Street
<br />San Leandro, CA 94577
<br />Phone: (510) 639-0639
<br />Fax: (510) 639-9116
<br />Columbia Electric, Inc.
<br />1980 Davis Street
<br />San Leandro, CA 94577
<br />Phone: (510) 430-9505
<br />Fax: (510) 430 1860
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />ITEM COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Install curb and gutter per drawing
<br />750 LF
<br />$55.00
<br />$41,250.00
<br />$45.00
<br />$33,750.00
<br />$75.00
<br />$56,250.00
<br />$115.50
<br />$86,625.00
<br />100 case 3101
<br />2
<br />Install sidewalk per drawing 100
<br />1200 SF
<br />$15.00
<br />$18,000.00
<br />$12.00
<br />$14,400.00
<br />$14.50
<br />$17,400.00
<br />$24.68
<br />$29,616.00
<br />case 3101
<br />3
<br />Install wheelchair curb cut ramp
<br />5000 SF
<br />$15.00
<br />$75,000.00
<br />$12.00
<br />$60,000.00
<br />$20.35
<br />$101,750.00
<br />$31.50
<br />$157,500.00
<br />per drawing 106A and B case
<br />3101
<br />4
<br />Install valley gutter per drawing
<br />500 SF
<br />$20.00
<br />$10,000.00
<br />$24.00
<br />$12,000.00
<br />$28.60
<br />$14,300.00
<br />$63.00
<br />$31,500.00
<br />114 case 3101
<br />5
<br />Provide Traffic Control plan and
<br />18 ST
<br />$800.00
<br />$14,400.00
<br />$1,800.00
<br />$32,400.00
<br />$2,500.00
<br />$45,000.00
<br />$3,000.00
<br />$54,000.00
<br />implement traffic control per
<br />section 7-10.3.3 and 7-10.3.4
<br />6
<br />Furnish and Install Sleeve and
<br />0 EA
<br />$150.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />Advanced Unistruct Sign Pole per
<br />Sheet 15
<br />7
<br />Furnish and Install foundation of
<br />2 EA
<br />$2,480.00
<br />$4,960.00
<br />$1,200.00
<br />$2,400.00
<br />$3,450.00
<br />$6,900.00
<br />$1,500.00
<br />$3,000.00
<br />1 B Pole per Sheet 15
<br />8
<br />Install City Provided TAPCO
<br />2 EA
<br />$1,000.00
<br />$2,000.00
<br />$6,500.00
<br />$13,000.00
<br />$1,250.00
<br />$2,500.00
<br />$2,500.00
<br />$5,000.00
<br />RRFB System per Sheet 15
<br />9
<br />Install traffic sign and Pole per
<br />2 EA
<br />$95.00
<br />$190.00
<br />$600.00
<br />$1,200.00
<br />$275.00
<br />$550.00
<br />$500.00
<br />$1,000.00
<br />10
<br />Remove Existing Sign and Pole
<br />2 EA
<br />$100.00
<br />$200.00
<br />$250.00
<br />$500.00
<br />$275.00
<br />$550.00
<br />$500.00
<br />$1,000.00
<br />per Sheet 15
<br />11
<br />Furnish and Install Sign Pole,
<br />1 EA
<br />$9,000.00
<br />$9,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,840.00
<br />$5,840.00
<br />$5,000.00
<br />$5,000.00
<br />Speed Feedback Sign, and R2-
<br />1(35) Sign per Sheet 18
<br />12
<br />Cast in Place domes
<br />25 EA
<br />$800.00
<br />$20,000.00
<br />$500.00
<br />$12,500.00
<br />$1,320.00
<br />$33,000.00
<br />$1,050.00
<br />$26,250.00
<br />Bid Summary - APS Upgrade 2012 Page 1 of 6 11 Printed 5/13/2015 @ 8:33 AM