BID SUMMARY
<br />�E riy r.
<br />u ^�ffi
<br />\SPO RAT4�
<br />PROJECT TITLE: Washington Ave At Monterey Blvd/Bradrick Dr
<br />Traffic Signal Modification
<br />PROJECT NO.: 11-150-28-190
<br />BID NO.: 14-15.016
<br />FEDERAL AID PROJECT: HSIPL-5041(041)
<br />its document is a summary of bids received for the subject project and are
<br />-ovided only as a convenience. Listing of a particular bid is not a finding that
<br />ich bid has been found to be responsive or accepted as complete by the City.
<br />n award of contract, if any, is subject to approval of the City Council and/or the
<br />ity Manager. Contractors should refer to the contract documents for bidding
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Columbia Electric, Inc.
<br />Tennyson Electric, Inc.
<br />Steiny and Company, Inc.
<br />DATE: Thursday, May 14, 2015
<br />Date Approved:
<br />4/16/2015
<br />1980 Davis Street
<br />7275 National Drive, Suite A-2
<br />27 Sheridan Street
<br />TIME: 3:00 p.m.
<br />Prepared by:
<br />N. Thom
<br />San Leandro, CA 94577
<br />Livermore, CA 94550
<br />Vallejo, CA 94590
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 430-9505
<br />Phone: (925) 606-1038
<br />Phone: (707) 552-6900
<br />Fax: (510) 430-1860
<br />Fax: (925) 606-7656
<br />Fax: (707) 552-7500
<br />ITEM
<br />NO.
<br />ITEM
<br />QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Mobilization
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$10,616.00
<br />$10,616.00
<br />$4,500.00
<br />$4,500.00
<br />$5,000.00
<br />$5,000.00
<br />2
<br />Temporary Traffic Control
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$11,500.00
<br />$11,500.00
<br />$10,925.00
<br />$10,925.00
<br />$13,523.00
<br />$13,523.00
<br />3
<br />Install & Terminate Fiber in
<br />1 LS
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$5,000.00
<br />$2,365.00
<br />$2,365.00
<br />$4,200.00
<br />$4,200.00
<br />Controller Cabinet. Provide
<br />Ethernet Switch, Patch Cord,
<br />Connectors & Splice Enclosure.
<br />System Test
<br />4
<br />Furnish and Install Traffic Signal,
<br />1 LS
<br />$184,715.00
<br />$184,715.00
<br />$206,000.00
<br />$206,000.00
<br />$256,658.00
<br />$256,658.00
<br />$241,000.00
<br />$241,000.00
<br />Street Light and Accessories as
<br />shown on Plans and
<br />Specifications
<br />5
<br />Remove & Dispose of Existing
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$25,000.00
<br />$25,000.00
<br />$16,500.00
<br />$16,500.00
<br />$28,000.00
<br />$28,000.00
<br />Signal Equipment & Foundation
<br />6
<br />Install Striping and pavement
<br />1 LS
<br />$2,000.00
<br />$2,000.00
<br />$3,575.00
<br />$3,575.00
<br />$4,950.00
<br />$4,950.00
<br />$5,900.00
<br />$5,900.00
<br />Markings
<br />7
<br />Potholing Per Section 306-0.2
<br />31 EA
<br />$400.00
<br />$12,400.00.
<br />$250.00
<br />$7,750.00
<br />$400.00
<br />$12,400.00
<br />$850.00
<br />$26,350.00
<br />TOTAL BASE BID:
<br />$234,115.00
<br />$269,441.00
<br />$308,298.00
<br />$323,973.00
<br />SUBCONTRACTORS:
<br />Chrisp Company
<br />B3 Solutions
<br />Compass Engineering
<br />Compass Engineering
<br />Chrisp Company
<br />Norwood Construction
<br />Bayside Stripe
<br />SECURITIES:
<br />10% Bid Bond
<br />10% Bid Bond
<br />10% Bid Bond
<br />Washington -Monterey Traffic Signal Page 1 of 4 Printed 5/14/2015 @ 4:51 PM