My WebLink
|
Help
|
About
|
Sign Out
Home
8A Consent 2015 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0706
>
8A Consent 2015 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2015 1:16:46 PM
Creation date
7/2/2015 1:16:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/6/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0706 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0706
Minutes 2015 0615
(Superseded by)
Path:
\City Clerk\City Council\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
June 15, 2015City Council Draft Minutes <br />County Transportation Commission for the Distribution and Receipt of <br />Measure BB Transportation Sales Tax Revenue <br />15-326 RESOLUTION Authorizing the City Manager to Enter the City into a <br />Master Programs Funding Agreement with the Alameda County <br />Transportation Commission for the Distribution and Receipt of <br />Measure BB Transportation Sales Tax Revenue <br />Adopted on the Consent Calendar. <br />Enactment No: Reso 2015-105 <br />8.E.15-304 Staff Report for a Resolution to Increase the Construction Contract <br />Change Order Cap from 25% to 40% (from $60,659 to $97,054; a <br />Change Order Cap Increase of $36,395) for the San Leandro Ball <br />Park Locker/Restroom Refurbishment Project, Project No. 2003.0331 <br />15-305 RESOLUTION to Increase the Construction Contract Change Order <br />Cap from 25% to 40% (from $60,659 to $97,054; a Change Order Cap <br />Increase of $36,395) for the San Leandro Ball Park Locker/Restroom <br />Refurbishment Project, Project No. 2003.0331 <br />Adopted on the Consent Calendar. <br />Enactment No: Reso 2015-106 <br />8.F.15-204 Staff Report for a Resolution to Increase the Construction Contract <br />Change Order Cap from 25% to 40% (from $331,337 to $530,140; a <br />Change Order Cap Increase of $198,803) for the Fiber Conduit for <br />Broadband Network Project to Maximize the Expenditure of Available <br />Economic Development Agency Grant Funds, Project No. 2013.0320 <br />15-205 RESOLUTION to Increase the Construction Contract Change Order <br />Cap from 25% to 40% (from $331,337 to $530,140; a Change Order <br />Cap Increase of $198,803) for the Fiber Conduit for Broadband <br />Network Project, Project No. 2013.03203, to Maximize the <br />Expenditure of Available Economic Development Agency Grant <br />Funds, Project No. 2013.03203 <br />Adopted on the Consent Calendar. <br />Enactment No: Reso 2015-107 <br />8.G.15-279 Staff Report for a Resolution to Award a Construction Contract to <br />Ray’s Electric for the Accessible Pedestrian Signals (APS) Upgrade <br />2012, Project 2012.0220 <br />15-280 RESOLUTION Awarding Construction Contract to Ray’s Electric for <br />APS Upgrade 2012, Project No. 2012.0220 (awards the contract to <br />the lowest responsible bidder in the amount of $371,000.00 from <br />Measure B and New Freedom Grant) <br />Page 4City of San Leandro Printed on 6/17/2015
The URL can be used to link to this page
Your browser does not support the video tag.