Laserfiche WebLink
t <br /> 4 <br /> 12. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, <br /> memoranda or other written documents or materials prepared by Contractor pursuant to this <br /> Agreement shall become the property of City upon completion of the work to be performed <br /> hereunder or upon termination of the Agreement. Reuse of said document for other than this <br /> project shall be at the City's sole risk. <br /> 13. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all <br /> laws applicable to the performance of the work hereunder, including, but not limited to, laws . <br /> prohibiting discrimination based on race, religious creed, color, national origin, ancestry, <br /> physical handicap, medical condition, marital status or sex. <br /> 14. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, <br /> written studies and other printed material on recycled paper to the extent it is available at equal <br /> or less cost than virgin paper. <br /> 15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br /> administrator, the first page of a technical report, first page of design specifications, and each <br /> page of construction drawings shall be stamped/sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br /> and Signature of Registered Professional with report/design responsibility" as per sample below. <br /> Seal and Signature of Registered Professional with <br /> 1. report/design responsibility <br /> Exhibit D Page 6 of 6 <br /> 6/12/95 WPCP Clarifier No.2 Odor Control <br /> 5/20/97 rev. <br />