My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0720
>
4A Public Hearing 2015 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:57:43 AM
Creation date
7/30/2015 4:33:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0720 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Reso 2015-125
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
814
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
to staff is to maintain the existing San Leandro Marina for as long as financially feasible, for the purpose of <br />the environmental analysis, it is being assumed that the harbor masters office, fuel pump/dock, and the <br />462 existing boat slips in the harbor basin would eventually be removed by the City at such time as safe <br />and navigable boating operations cease to exist. Additionally, five of the tees/holes on the nine -hole <br />Marina Golf Course would need to be reconfigured in order to accommodate the housing that is proposed <br />to be built on the grounds of the course; however, no tees/holes would be removed as part of the Project. <br />The existing Marina Inn building and the Horatio's restaurant building on the site would remain a part of <br />the Project area. <br />New features on the site as a result of the Project include an approximately 150,000 -square -foot office <br />campus, a new 200 -room hotel, an approximately 15,000 -square -foot conference center, 354 housing <br />units, 3 new restaurants totaling approximately 21,000 square feet, and a new parking structure. To <br />accommodate this growth a variety of public amenities would be installed. Some of these amenities <br />include a new approximately 2,500 -square -foot community library/community meeting space, an aquatic <br />center/dock, bocce ball courts, outdoor recreational areas, picnic areas, a perched beach, pedestrian <br />piers, two miles of public promenade, a natural shoreline element along the interior of the harbor basin, a <br />pedestrian/bicycle bridge, a boardwalk/lookout pier, several small finger piers, and refurbishment of <br />existing public restrooms on site. Additionally, with implementation of the Project and removal of the <br />existing boat slips, the harbor would only be open to non -motorized watercraft. For this reason, the <br />Project includes the construction of a small boat launch, a kayak storage building, and an aeration <br />fountain in the harbor basin to aide in water circulation. <br />1.3 SUMMARY OF PROJECT ALTERNATIVES <br />This Draft EIR analyzes alternatives to the Project that are designed to reduce the significant <br />environmental impacts of the Project and feasibly attain most of the Project objectives. There is no set <br />methodology for comparing the alternatives or determining the environmentally superior alternative <br />under CEQA. Identification of the environmentally superior alternative involves weighing and balancing all <br />of the environmental resource areas by the City. The following alternatives to the Project were considered <br />and analyzed in detail: <br />■ No Project <br />■ Relocated Hotel Alternative <br />■ Reduced Density/Intensity Alternative <br />Chapter 6, Alternatives to the Project, includes a complete discussion of these alternatives and of <br />alternatives that were rejected for various reasons. <br />1.3.1 NO PROJECT ALTERNATIVE <br />Consistent with Section 15126.6 (e) (2) of the CEQA Guidelines, under the No Project Alternative, the <br />Project site would remain in its existing condition. Although existing land use designations and zoning <br />would allow for some future development under existing conditions, under this alternative, the Project <br />site would not be further developed. Further, improvements proposed by the Project, such as removing <br />the marina infrastructure, adding new housing units, new restaurants, commercial and retail uses, a new <br />
The URL can be used to link to this page
Your browser does not support the video tag.