My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0720
>
4A Public Hearing 2015 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:57:43 AM
Creation date
7/30/2015 4:33:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0720 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Reso 2015-125
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
814
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significance <br />Before <br />Significant Impact Mitigation <br />NOISE -2. Implementation of the Project could result in <br />the exposure of persons to or generation of excessive <br />groundborne vibration or groundborne noise levels. <br />Mitigation Measures <br />NOISE -113: All residential units of the Project shall include an <br />alternative form of ventilation, such as noise -baffled passive air <br />ventilation systems or mechanical air conditioning systems, that <br />would allow windows to remain closed for prolonged periods of time <br />to meet the interior noise standard of 45 dBA Ldn established by the <br />City and the Uniform Building Code Requirements. <br />NOISE -2. For construction, grading, and demolition activities that <br />would use vibration -intense equipment such as pile driving, rock <br />blasting and vibratory rollers that would occur within 250 feet of <br />existing residential, commercial, libraries, and hotel buildings, the <br />following mitigation measures shall be implemented in close <br />coordination with City of San Leandro staff so that alternative <br />construction techniques or scheduling approaches are undertaken. <br />For projects where vibration -intense equipment would be utilized <br />within 250 feet of existing residential, commercial, libraries, and <br />hotel buildings the following controls to reduce potential vibration <br />impacts shall be implemented during construction, as practical: <br />■ Prior to the issuance of building permits, City staff shall <br />coordinate with the applicant and/or construction contractor to <br />discuss alternative methods of construction for vibration -intense <br />activities in close proximity to sensitive uses or existing <br />structures. As part of this coordination, the applicant and/or <br />construction contractor shall identify construction methods not <br />involving vibration -intensive equipment or activities. For example, <br />drilled foundation caisson holes that would produce less vibration <br />than pile driving methods, or the use of non -explosive rock <br />breaking methods. <br />■ The project applicant or constructor contractor shall implement <br />reduced -vibration alternative methods identified during project <br />review during subsequent excavation, grading, and construction <br />for work conducted in close proximity to sensitive structures or <br />uses. <br />■ If possible, vibration -intense construction activities should take <br />place during times when nearby sensitive receptors, such as <br />libraries and hotel rooms are at their lowest utilization/ <br />Significance <br />With <br />Mitigation <br />SU <br />
The URL can be used to link to this page
Your browser does not support the video tag.