My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2015-125
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2015
>
Reso 2015-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 5:44:18 PM
Creation date
7/30/2015 4:41:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
4A Public Hearing 2015 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significant Impact <br />Significance <br />Before <br />Mitigation Mitigation Measures <br />Significance <br />With <br />Mitigation <br />estimates for future sea level rise and current and future flood <br />protection. A range of sea level rise projections for mid-century <br />and end of century shall be used in the risk assessment along with <br />inundation maps. The risk assessment shall identify all types of <br />potential flooding, degrees of uncertainty, consequences of <br />defense failure, and risks to existing habitat from proposed flood <br />protection devices. The Project shall be designed to be resilient to <br />a mid-century sea level rise projection. If the Project would <br />remain in place longer than mid-century, an adaptive <br />management plan shall be developed to address the long-term <br />impacts that would arise. The results of the risk assessment shall <br />be incorporated into the site design, as reflected in the site plan <br />review and tentative map review. The sea level rise risk <br />assessment shall also be submitted to BCDC for review and <br />approval for the areas of the project that are within BCDC’s <br />jurisdiction (i.e., within 100 feet of the shoreline), prior to the <br />start of construction or development. <br />HYDRO-8. The Project would not expose people or <br />structures to a significant risk of loss, injury or death <br />involving flooding, including flooding as a result of the <br />failure of a levee or dam. <br />No Impact N/A N/A <br />HYDRO-9. The Project would not result in inundation by <br />seiche, tsunami, or mudflow. <br />LTS N/A N/A <br />HYDRO-10. The Project, in combination with past, <br />present, and reasonably foreseeable projects, would not <br />result in significant cumulative impacts with respect to <br />hydrology and water quality. <br />LTS N/A N/A <br />LAND USE AND PLANNING <br />LAND-1. The Project would not physically divide an <br />established community. <br />LTS N/A N/A <br />LAND-2. The proposed Project would not conflict with <br />applicable land use plans, policies, or regulations adopted <br />for the purpose of avoiding or mitigating an <br />environmental effect. <br />LTS N/A N/A
The URL can be used to link to this page
Your browser does not support the video tag.