My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2015-125
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2015
>
Reso 2015-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 5:44:18 PM
Creation date
7/30/2015 4:41:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
4A Public Hearing 2015 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significant Impact <br />Significance <br />Before <br />Mitigation Mitigation Measures <br />Significance <br />With <br />Mitigation <br />TRAF-7M: The proposed Project would cause the level of <br />service at the intersection of Monarch Bay Drive and <br />Mulford Point Drive (#19) to reduce from LOS A to LOS F <br />in the PM peak hour. <br />S TRAF-7M: Implement Mitigation Measure TRAF-1D by installing a <br />roundabout at the intersection of Monarch Bay Drive and Mulford <br />Point Drive (#19). <br />LTS <br />UTILITIES AND SERVICE SYSTEMS <br />UTIL-1. The Project would have sufficient water supplies <br />available to the serve the Project from existing <br />entitlements and resources, and would not require new <br />or expanded entitlements. <br />LTS N/A N/A <br />UTIL-2. The Project would not require or result in the <br />construction of new water facilities or expansion of <br />existing facilities, the construction of which would cause <br />significant environmental effects. <br />LTS N/A N/A <br />UTIL-3. The Project, in combination with past, present, <br />and reasonably foreseeable projects, would result in less <br />than significant cumulative impacts with respect to water <br />service. <br />LTS N/A N/A <br />UTIL-4. Implementation of the Project would not exceed <br />wastewater treatment requirements of the San Francisco <br />Bay Regional Water Quality Control Board. <br />LTS N/A N/A <br />UTIL-5. The Project would not require or result in the <br />construction of new wastewater treatment facilities or <br />expansion of existing facilities, the construction of which <br />would cause significant environmental effects. <br />LTS N/A N/A <br />UTIL-6. The Project would not result in the determination <br />by the wastewater treatment provider, which serves the <br />Project that it does not have adequate capacity to serve <br />the Project’s projected demand in addition to the <br />provider’s existing commitments. <br />LTS N/A N/A <br />UTIL-7. The Project, in combination with past, present, <br />and reasonably foreseeable projects would result in less <br />than significant cumulative impacts with respect to <br />wastewater service. <br />LTS N/A N/A
The URL can be used to link to this page
Your browser does not support the video tag.