My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2015-134
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2015
>
Reso 2015-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 4:07:10 PM
Creation date
7/30/2015 4:41:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
8G Consent 2015 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 4 <br />II. ESTIMATE OF COSTS <br /> The cost of servicing, maintaining, repairing and replacing the improvements as <br />described in the Plans and Specifications are summarized as follows: <br />A. 2015/16 District Budget <br /> <br />* Alameda County requires that assessments are divisible by two, therefore the Required <br />Assessment will vary from actual assessments applied on the county tax roll due to rounding. <br />DESCRIPTION <br />ESTIMATED COST <br />FISCAL YEAR <br />2015/2016 <br />DIRECT COSTS <br />Storm Water Facilities Maintenance <br />Storm water lift station and detention pond $46,110.22 <br />Storm water treatment pond in Phase 1B 10,119.42 <br />Maintenance of Buffer Area and Trail <br />Trail west of Phase 1B and 2B 70,448.52 <br />Trail north of Phase 2B and 3 62,924.28 <br />Animal Control 10,000.00 <br />Rodent and Pest Control 1,500.00 <br />Tidal Marshlands Monitoring and Maintenance - All Marshes 40,000.00 <br />Maintenance of Lewelling Boulevard Improvements <br />Soundwalls east of SPRR 1,400.00 <br />Roundabout to Wicks 25,250.00 <br />Roundabout west to SPRR 12,684.18 <br />Capital Improvement Projects <br />Bay Friendly Landscape at Lewelling Entrance 20,000.00 <br />Riprap Repair 20,000.00 <br />DIRECT COSTS SUBTOTAL $320,436.62 <br />ADMINISTRATION COSTS <br />City, Engineering, Legal, Consultant, Insurance $51,824.00 <br />ADMINISTRATION SUBTOTAL $51,824.00 <br />LEVY BREAKDOWN <br />Total Direct and Admin Costs $372,260.62 <br />Operating Reserve Collection 0.00 <br />TOTAL COSTS $372,260.62 <br />LEVY ADJUSTMENTS <br />Estimated Reserve Surplus from Previous Year ($24,000.00) <br />Estimated Reserve Interest Earnings (4,721.00) <br />Reserve Replenishment 0.00 <br />TOTAL LEVY ADJUSTMENTS ($28,721.00) <br />REQUIRED ASSESSMENT $343,539.62
The URL can be used to link to this page
Your browser does not support the video tag.