Laserfiche WebLink
San Leandro Transit Center <br />DESIGN CHALLENGES <br />■ The design is "work in process" and there is no <br />agreement on the Transit Center footprint <br />■ Maintain the ingress north of the Transit Center <br />entrance on San Leandro Blvd <br />■ Minimize the loss of parking spaces <br />■ Relocation and re -timing of the traffic signals <br />■ Provide for a signaled pedestrian crossing <br />TifL4N3/T <br />