My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2015 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0720
>
8E Consent 2015 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:16:47 AM
Creation date
7/30/2015 5:43:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0720 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Reso 2015-129
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
C C�ppwwEl,,% <br />BVMM..Woddig WWd=,M- <br />May 19, 2014 <br />Ingrid Lin <br />City of San Leandro <br />Engineering and Transportation Department <br />835 East 14th Street. <br />San Leandro, CA 94577 <br />Subject: Proposal for Additional Services to Provide HAZWOPER-trained operator — <br />WPCP Contaminated Dirt Relocation Project <br />Dear Ingrid, <br />As outlined in the agreement date April 2, 2014, the City of San Leandro (City) was <br />supposed to provide a Contractor to assist our Subconsultant (Fugro) with sampling <br />activities. However, the Contractor identified by the City has not had the availability to <br />provide a HAZWOPER-trained operator. Consequently, the City asked Fugro to arrange for <br />their own HAZWOPER-trained operator to provide the field assistance. <br />Fugro has identified a HAZWOPER contractor (Controlled Environmental Services, <br />CES) with availability to assist Fugor with field sampling. <br />The incremental cost for this effort is $4,576. This includes a 10% markup. <br />A detailed breakdown of cost and description of scope can be found in the attached <br />proposal from Fugro. <br />We request you to kindly approve this request for amendment. <br />Please do not hesitate to contact us if you have any questions or require additional <br />information. <br />Sincerely, <br />CAROLLO ENGINEERS, INC. <br />Aw <br />Rick L. Chan., P.E. Zaheer Shaikh, P.E. <br />Vice President/Principal-in-Charge Project Manager <br />2700 YGNACIO VALLEY ROAD, SUITE 300 • WALNUT CREEK, CALIFORNIA 94598 • (925) 932-1710 • FAX (925) 930-0208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.