a4ya �- 1>
<br />\ °,9�oaA�rta F
<br />PROJECT TITLE: San Leandro Boulevard Rehabilitation:
<br />Williams St. to Hudson Ln.
<br />PROJECT NO.: 2014.0420
<br />BID NO.: 14-15.017
<br />BID SUMMARY
<br />his document is a summary of bids received for the subject project and are
<br />rovided only as a convenience. Listing of a particular bid is not a finding that
<br />Lich bid has been found to be responsive or accepted as complete by the City.
<br />,n award of contract, if any, is subject to approval of the. City Council and/or the
<br />:ity Manager. Contractors should refer to the contract documents for bidding
<br />BID OPENING
<br />DATE: June 4, 2015
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 5/13/2015
<br />Prepared by: M. Goralka
<br />Desilva Gates Construction LP
<br />11555 Dublin Boulevard
<br />Dublin, CA 94568
<br />Phone: (925) 829-9220
<br />Fax: (925) 803-4263
<br />RGW Construction
<br />550 Greenville Road
<br />Livermore, CA 94550
<br />Phone: (925) 606-2400
<br />Fax: (925) 961-1925
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Mobilization and General
<br />1 LS
<br />$83,013.12
<br />$83,013.12
<br />$100,000.00
<br />$100,000.00
<br />$120,000.00
<br />$120,000.00
<br />Conditions per Section 9-3.4
<br />2
<br />Labor Compliance Monitoring per
<br />4 MO
<br />$750.00
<br />$3,000.00
<br />$50.00
<br />$200.00
<br />$500.00
<br />$2,000.00
<br />Section 7-2.2.4
<br />3
<br />Traffic and Pedestrian Control,
<br />1 LS
<br />$30,000.00
<br />$30,000.00
<br />$90,000.00
<br />$90,000.00
<br />$133,000.00
<br />$133,000.00
<br />Signage per Sections 7-10 and
<br />315.
<br />4
<br />Compact Existing Street Base per
<br />21,500 SY
<br />$0.50
<br />$10,750.00
<br />$1.00
<br />$21,500.00
<br />$0.30
<br />$6,450.00
<br />Section 301-2.3
<br />5
<br />AC Milling and Offhaul (Final Qty)
<br />3,870 CY
<br />$60.00
<br />$232,200.00
<br />$45.00
<br />$174,150.00
<br />$37.00
<br />$143,190.00
<br />per Section 302-1
<br />6
<br />AC Paving per Section 302-5
<br />5,942 TN
<br />$80.00
<br />$475,360.00
<br />$75.00
<br />$445,650.00
<br />$70.00
<br />$415,940.00
<br />7
<br />Pavement Fabric per Section 302-
<br />21,115 SY
<br />$7.00
<br />$147,805.00
<br />$3.60
<br />$76,014.00
<br />$4.00
<br />$84,460.00
<br />7
<br />8
<br />Vertical Curb w/ Spill Gutter per
<br />395 LF
<br />$70.00
<br />$27,650.00
<br />$60.00
<br />$23,700.00
<br />$75.00
<br />$29,625.00
<br />City Std. Plan 118
<br />9
<br />Curb and Gutter per City Std.
<br />156 LF
<br />$56.00
<br />$8,736.00
<br />$70.00
<br />$10,920.00
<br />$75.00
<br />$11,700.00
<br />Plan 100
<br />10
<br />Stamped Concrete per City Std.
<br />315 SF
<br />$20.00
<br />$6,300.00
<br />$17.00
<br />$5,355.00
<br />$22.00
<br />$6,930.00
<br />Plan 116
<br />11
<br />Sidewalk per Std. Plan 100
<br />155 SF
<br />$18.00
<br />$2,790.00
<br />$15.00
<br />$2,325.00
<br />$18.00
<br />$2,790.00
<br />12
<br />Ramped Sidewalk per City Std.
<br />1,185 SF
<br />$18.00
<br />$21,330.00
<br />$18.00
<br />$21,330.00
<br />$41.00
<br />$48,585.00
<br />Plans 106A -D
<br />13
<br />Curb Drain per City Std Plan 212
<br />2 EA
<br />$1,000.00
<br />$2,000.00
<br />$200.00
<br />$400.00
<br />$950.00
<br />$1,900.00
<br />14
<br />Raised Lane Separators /
<br />250 LF
<br />$10.00
<br />$2,500.00
<br />$90.00
<br />$22,500.00
<br />$65.00
<br />$16,250.00
<br />Delineators per Section 312-1.1
<br />Bid Summary -San Leandro Blvd Rehab - Washington to Hudson Page 1 of 3 Printed 6/4/2015 @ 4:16 PM
<br />
|