a4ya �- 1> <br />\ °,9�oaA�rta F <br />PROJECT TITLE: San Leandro Boulevard Rehabilitation: <br />Williams St. to Hudson Ln. <br />PROJECT NO.: 2014.0420 <br />BID NO.: 14-15.017 <br />BID SUMMARY <br />his document is a summary of bids received for the subject project and are <br />rovided only as a convenience. Listing of a particular bid is not a finding that <br />Lich bid has been found to be responsive or accepted as complete by the City. <br />,n award of contract, if any, is subject to approval of the. City Council and/or the <br />:ity Manager. Contractors should refer to the contract documents for bidding <br />BID OPENING <br />DATE: June 4, 2015 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 5/13/2015 <br />Prepared by: M. Goralka <br />Desilva Gates Construction LP <br />11555 Dublin Boulevard <br />Dublin, CA 94568 <br />Phone: (925) 829-9220 <br />Fax: (925) 803-4263 <br />RGW Construction <br />550 Greenville Road <br />Livermore, CA 94550 <br />Phone: (925) 606-2400 <br />Fax: (925) 961-1925 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Mobilization and General <br />1 LS <br />$83,013.12 <br />$83,013.12 <br />$100,000.00 <br />$100,000.00 <br />$120,000.00 <br />$120,000.00 <br />Conditions per Section 9-3.4 <br />2 <br />Labor Compliance Monitoring per <br />4 MO <br />$750.00 <br />$3,000.00 <br />$50.00 <br />$200.00 <br />$500.00 <br />$2,000.00 <br />Section 7-2.2.4 <br />3 <br />Traffic and Pedestrian Control, <br />1 LS <br />$30,000.00 <br />$30,000.00 <br />$90,000.00 <br />$90,000.00 <br />$133,000.00 <br />$133,000.00 <br />Signage per Sections 7-10 and <br />315. <br />4 <br />Compact Existing Street Base per <br />21,500 SY <br />$0.50 <br />$10,750.00 <br />$1.00 <br />$21,500.00 <br />$0.30 <br />$6,450.00 <br />Section 301-2.3 <br />5 <br />AC Milling and Offhaul (Final Qty) <br />3,870 CY <br />$60.00 <br />$232,200.00 <br />$45.00 <br />$174,150.00 <br />$37.00 <br />$143,190.00 <br />per Section 302-1 <br />6 <br />AC Paving per Section 302-5 <br />5,942 TN <br />$80.00 <br />$475,360.00 <br />$75.00 <br />$445,650.00 <br />$70.00 <br />$415,940.00 <br />7 <br />Pavement Fabric per Section 302- <br />21,115 SY <br />$7.00 <br />$147,805.00 <br />$3.60 <br />$76,014.00 <br />$4.00 <br />$84,460.00 <br />7 <br />8 <br />Vertical Curb w/ Spill Gutter per <br />395 LF <br />$70.00 <br />$27,650.00 <br />$60.00 <br />$23,700.00 <br />$75.00 <br />$29,625.00 <br />City Std. Plan 118 <br />9 <br />Curb and Gutter per City Std. <br />156 LF <br />$56.00 <br />$8,736.00 <br />$70.00 <br />$10,920.00 <br />$75.00 <br />$11,700.00 <br />Plan 100 <br />10 <br />Stamped Concrete per City Std. <br />315 SF <br />$20.00 <br />$6,300.00 <br />$17.00 <br />$5,355.00 <br />$22.00 <br />$6,930.00 <br />Plan 116 <br />11 <br />Sidewalk per Std. Plan 100 <br />155 SF <br />$18.00 <br />$2,790.00 <br />$15.00 <br />$2,325.00 <br />$18.00 <br />$2,790.00 <br />12 <br />Ramped Sidewalk per City Std. <br />1,185 SF <br />$18.00 <br />$21,330.00 <br />$18.00 <br />$21,330.00 <br />$41.00 <br />$48,585.00 <br />Plans 106A -D <br />13 <br />Curb Drain per City Std Plan 212 <br />2 EA <br />$1,000.00 <br />$2,000.00 <br />$200.00 <br />$400.00 <br />$950.00 <br />$1,900.00 <br />14 <br />Raised Lane Separators / <br />250 LF <br />$10.00 <br />$2,500.00 <br />$90.00 <br />$22,500.00 <br />$65.00 <br />$16,250.00 <br />Delineators per Section 312-1.1 <br />Bid Summary -San Leandro Blvd Rehab - Washington to Hudson Page 1 of 3 Printed 6/4/2015 @ 4:16 PM <br />