Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />Rin No • 1a.i-s;_n2a <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />RobertA. Bothman, Inc. <br />Guerra Construction <br />RGW Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: <br />6/17/2015 <br />2690 Scott Boulevard <br />984 Memorex Drive <br />550 Greenville Road <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Santa Clara, CA 95050 <br />Santa Clara, CA 95050 <br />Livermore, Ca 94550 <br />LOCATION: City Clerk's Office <br />Phone: (408) 279-2277 <br />Phone: (408) 279-2027 <br />Phone: (925) 606-2400 <br />Fax: (408) 279-2286 <br />Fax: (408) 279-2044 <br />Fax: (925) 961-1925 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />B7 <br />City std. sidewalk and base <br />300 SF <br />$10.00 <br />$3,000.00 <br />$9.00 <br />$2,700.00 <br />$12.00 <br />$3,600.00 <br />$22.00 <br />$6,600.00 <br />B8 <br />City std. curb & gutter & base, incl. <br />135 LF <br />$50.00 <br />$6,750.00 <br />$46.00 <br />$6,210.00 <br />$47.00 <br />$6,345.00 <br />$86.00 <br />$11,610.00 <br />courtesy curb, flush curb, & 9" full depth <br />AC <br />B9 <br />City std, vertical curb & base <br />22 LF <br />$35.00 <br />$770.00 <br />$54.00 <br />$1,188.00 <br />$28.00 <br />$616.00 <br />$108.00 <br />$2,376.00 <br />B10 <br />Soil preparation and fine grading <br />529 SF <br />$0.75 <br />$396.75 <br />$1.00 <br />$529.00 <br />$2.00 <br />$1,058.00 <br />$2.00 <br />$1,058.00 <br />B11 <br />Tree - 24 inch box size <br />2 EA <br />$350.00 <br />$700.00 <br />$700.00 <br />$1,400.00 <br />$550.00 <br />$1,100.00 <br />$400.00 <br />$800.00 <br />B12 <br />Shrubs -1 gallon <br />30 EA <br />$12.00 <br />$360.00 <br />.$12.00 <br />$360.00 <br />$28.00 <br />$840.00 <br />$15.00 <br />$450.00 <br />B13 <br />Mulch, 3" layer <br />5 CY <br />$55.00 <br />$275.00 <br />$68.00 <br />$340.00 <br />$65.00 <br />$325.00 <br />$75.00 <br />$375.00 <br />B14 <br />Root barrier <br />108 LF <br />$7.00 <br />$756.00 <br />$9.00 <br />$972.00 <br />$17.00 <br />$1,836.00 <br />$8.00 <br />$864.00 <br />B15 <br />11rrigation system <br />529 SF <br />$4.00 <br />$2,116.00 <br />$3.001 <br />$1,587.00 <br />$12.00 <br />$6,348.00 <br />$3.00 <br />$1,587.00 <br />TOTAL ADDITIVE BID ITEM B: <br />$33,549.75 <br />$19,165.00 <br />$26,844.00 <br />$39,929.00 <br />ADDITIVE BID ITEM C <br />C1 <br />jArbor Shade Canopy 1 LS <br />1 $60,000.001 <br />$60,000.00 <br />00,00T <br />$50,700.00 <br />000.001 <br />$58,000.00 <br />$52,000-001 <br />$52,000.00 <br />TOTAL ADDITIVE BID ITEM C: <br />$60,000.00 <br />$50,700.00 <br />$58,000.00 <br />$52,000.00 <br />ADDITIVE BID ITEM D <br />D1 <br />Shade canopy at picnic tables <br />2 EA <br />$8,400.00 <br />$16,800.00 <br />$8,000.00 <br />$16,000.00 <br />$7,900.00 <br />$15,800.00 <br />$7,500.00 <br />$15,000.00 <br />D2 <br />Ping Pong Table <br />2 EA <br />$10,500.00 <br />$21,000.00 <br />$3,900.00 <br />$7,800.00 <br />$4,300.001 <br />$8,600.00 <br />$11,700.00 <br />$23,400.00 <br />TOTAL ADDITIVE BID D: <br />$37,800.00 <br />$23,800.00 <br />$24,400.00 <br />$38,400.00 <br />TOTAL BASE BID: <br />$2,523,474.84 <br />$1,849,855.50 <br />$1,901,051.50 ** <br />$2,458,053.70 <br />TOTAL BASE BID + ADDITIVE BID ITEM A: <br />$2,734,774.84 <br />$2,140,197.50 <br />$2,266,011.50 <br />$2,763,780.00 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A & B: <br />$2,768,324.59 <br />$2,159,362.50 <br />$2,292,855.50 ** <br />$2,803,709.00 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, & C: <br />$2,828,324.59 <br />$2,210,062.50 <br />$2,350,855.50 <br />$2,855,709.00 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, C & D: <br />$2,866,124.59 <br />$2,233,862.50 <br />$2,375,255.50 ** <br />$2,894,109.00 <br />Siempre Verde Park Rehab - Bid Summary Page 5 of 12 Printed 8/4/2015 @ 4:49 PM <br />