Laserfiche WebLink
BID SUMMARY <br />r <br />x anf+ vRrAPON <br />cg9PO—RAIEa star P�satec��c�X�xae , <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />BID NO.: 14-15.026 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Bay Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: 6/17/2015 <br />4026 Martin Luther King Jr. Way <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Oakland, CA 94609 <br />LOCATION: City Clerk's Office <br />Phone: (510) 658-7225 <br />Fax: (510) 658-4890 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID <br />1 <br />Mobilization and General Conditions <br />1 LS <br />$220,500.00 <br />$220,500.00 <br />$156,000.00 <br />$156,000.00 <br />2 <br />Erosion and Sedimentation Control, <br />1 LS <br />$5,250.00 <br />$5,250.00 <br />$31,200.00 <br />$31,200.00 <br />including SWPPP preparation and QSP <br />inspections <br />3 <br />Site Preparation <br />1 LS <br />$130,000.00 <br />$130,000.00 <br />$54,000.00 <br />$54,000.00 <br />4 <br />Demolition - Offsite <br />1 LS <br />$8,925.00 <br />$8,925.00 <br />$9,600.00 <br />$9,600.00 <br />5 <br />Cut/fill (balanced) (F) <br />1163 CY <br />$15.75 <br />$18,317.25 <br />$12.00 <br />$13,956.00 <br />6 <br />Export excess cut <br />251 CY <br />$26.25 <br />$6,588.75 <br />$48.00 <br />$12,048.00 <br />7 <br />Engineered fill below pavement <br />688 CY <br />$47.25 <br />$32,508.00 <br />$48.00 <br />$33,024.00 <br />8 <br />6" PVC SDR -26 Sanitary sewer <br />75 LF <br />$84.00 <br />$6,300.00 <br />$240.00 <br />$18,000.00 <br />9 <br />Sanitary sewer cleanout <br />1 EA <br />$1,575.00 <br />$1,575.00 <br />$300.00 <br />$300.00 <br />10 <br />Extending domestic water service from <br />1 LS <br />$3,675.00 <br />$3,675.00 <br />$1,200.00 <br />$1,200.00 <br />existing backflow to new building <br />11 <br />New backflow prevention assembly & <br />1 LS <br />$4,725.00 <br />$4,725.00 <br />$2,400.00 <br />$2,400.00 <br />enclosure with concrete pad <br />12 <br />Replace water service between meter <br />1 LS <br />$3,000.00 <br />$3,000.00 <br />$1,200.00 <br />$1,200.00 <br />and existing backflow preventer <br />13 <br />Bioretention areas <br />1 LS <br />$31,500.00 <br />$31,500.00 <br />$52,080.00 <br />$52,080.00 <br />14 <br />Mortar rock outfall <br />8 EA <br />$525.00 <br />$4,200.00 <br />$420.00 <br />$3,360.00 <br />15 <br />Storm drain manholes <br />1 EA <br />$4,725.00 <br />$4,725.00 <br />$5,280.00 <br />$5,280.00 <br />16 <br />Storm drain cleanout <br />1 EA <br />$1,575.00 <br />$1,575.00 <br />$300.00 <br />$300.00 <br />17 <br />Bioretention drainage basin inlets with <br />2 EA <br />$3,675.00 <br />$7,350.00 <br />$720.00 <br />$1,440.00 <br />domes <br />Siempre Verde Park Rehab - Bid Summary Page 7 of 12 Printed 8/4/2015 @ 4:49 PM <br />