BID SUMMARY
<br />r
<br />x anf+ vRrAPON
<br />cg9PO—RAIEa star P�satec��c�X�xae ,
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270
<br />BID NO.: 14-15.026
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Bay Construction
<br />DATE: Monday, August 3, 2015
<br />Date Approved: 6/17/2015
<br />4026 Martin Luther King Jr. Way
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />Oakland, CA 94609
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 658-7225
<br />Fax: (510) 658-4890
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />BASE BID
<br />1
<br />Mobilization and General Conditions
<br />1 LS
<br />$220,500.00
<br />$220,500.00
<br />$156,000.00
<br />$156,000.00
<br />2
<br />Erosion and Sedimentation Control,
<br />1 LS
<br />$5,250.00
<br />$5,250.00
<br />$31,200.00
<br />$31,200.00
<br />including SWPPP preparation and QSP
<br />inspections
<br />3
<br />Site Preparation
<br />1 LS
<br />$130,000.00
<br />$130,000.00
<br />$54,000.00
<br />$54,000.00
<br />4
<br />Demolition - Offsite
<br />1 LS
<br />$8,925.00
<br />$8,925.00
<br />$9,600.00
<br />$9,600.00
<br />5
<br />Cut/fill (balanced) (F)
<br />1163 CY
<br />$15.75
<br />$18,317.25
<br />$12.00
<br />$13,956.00
<br />6
<br />Export excess cut
<br />251 CY
<br />$26.25
<br />$6,588.75
<br />$48.00
<br />$12,048.00
<br />7
<br />Engineered fill below pavement
<br />688 CY
<br />$47.25
<br />$32,508.00
<br />$48.00
<br />$33,024.00
<br />8
<br />6" PVC SDR -26 Sanitary sewer
<br />75 LF
<br />$84.00
<br />$6,300.00
<br />$240.00
<br />$18,000.00
<br />9
<br />Sanitary sewer cleanout
<br />1 EA
<br />$1,575.00
<br />$1,575.00
<br />$300.00
<br />$300.00
<br />10
<br />Extending domestic water service from
<br />1 LS
<br />$3,675.00
<br />$3,675.00
<br />$1,200.00
<br />$1,200.00
<br />existing backflow to new building
<br />11
<br />New backflow prevention assembly &
<br />1 LS
<br />$4,725.00
<br />$4,725.00
<br />$2,400.00
<br />$2,400.00
<br />enclosure with concrete pad
<br />12
<br />Replace water service between meter
<br />1 LS
<br />$3,000.00
<br />$3,000.00
<br />$1,200.00
<br />$1,200.00
<br />and existing backflow preventer
<br />13
<br />Bioretention areas
<br />1 LS
<br />$31,500.00
<br />$31,500.00
<br />$52,080.00
<br />$52,080.00
<br />14
<br />Mortar rock outfall
<br />8 EA
<br />$525.00
<br />$4,200.00
<br />$420.00
<br />$3,360.00
<br />15
<br />Storm drain manholes
<br />1 EA
<br />$4,725.00
<br />$4,725.00
<br />$5,280.00
<br />$5,280.00
<br />16
<br />Storm drain cleanout
<br />1 EA
<br />$1,575.00
<br />$1,575.00
<br />$300.00
<br />$300.00
<br />17
<br />Bioretention drainage basin inlets with
<br />2 EA
<br />$3,675.00
<br />$7,350.00
<br />$720.00
<br />$1,440.00
<br />domes
<br />Siempre Verde Park Rehab - Bid Summary Page 7 of 12 Printed 8/4/2015 @ 4:49 PM