Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />BID NO.: 14-15.025 <br />BID OPENING ENGINEER'S ESTIMATE RobertA. Bothman, Inc. <br />DATE: Monday, August 3, 2015 Date Approved: 6/17/2015 2690 Scott Boulevard <br />TIME: 3:00 p.m. Prepared by: Kyle Lei Santa Clara, CA 95050 <br />LOCATION: City Clerk's Office <br />ITEM <br />NO. ITEM <br />A2 30 -inch Diameter Conductor Casing <br />A3 8 -1/4 -inch Diameter Pilot Bore <br />A4 Electric Resistance and Gamma Ray <br />Logging (E -log) <br />A5 17 -1/4 -inch Diameter Final Bore <br />A6 Install 8 -inch Diameter SDR17 PVC <br />Casing <br />A7 Install 8 -inch Diameter SDR17 PVC <br />Screens <br />A8 Install 1/4" x No. 10 Filter Pack <br />A9 Install 10 -sack Sanitary Seal <br />A10 Well Development <br />A11 Pump Testing <br />Al2 Construct Wellhead Pedestal <br />A13 Install 3 -inch Diameter PVC Drop Pipe, <br />Downhole Power Conductors, Tag Line <br />and Sounding Tube <br />A14 Install Submersible Pump <br />A15 Install Wellhead Piping and Hydro - <br />pneumatic System <br />A16 Install Electrical Service and Controls <br />QUANTITY <br />25 LF <br />450 LF <br />1 LS <br />350 LF <br />120 LF <br />230 LF <br />250 LF <br />100 LF <br />24 HOUR <br />1 LS <br />1 LS <br />320 LF <br />UNIT COST <br />$17 <br />$1 <br />uerra Construction <br />Phone: (408)279-2277 <br />34 Memorex Drive <br />Fax: (408) 279-2286 <br />anta Clara, CA 95050 <br />hone: (408) 279-2027 <br />ax: (408) 279-2044 <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />$6,250.00 <br />$542.00 <br />$13,550.00 <br />$27,000.00 <br />$55.00 <br />$24,750.00 <br />$3,500.00 <br />$4,335.00 <br />$4,335.00 <br />$22,750.00 <br />$87.00 <br />$30,450.00 <br />$4,800.00 <br />$44.00 <br />$5,280.00 <br />$11,500.00 <br />$66.00 <br />$15,180.00 <br />$2,500.00 <br />$38.00 <br />$9,500.00 <br />$7,500.00 <br />$44.00 <br />$4,400.00 <br />$12,000.00 <br />$542.00 <br />$13,008.00 <br />$17,500.00 <br />$8,670.00 <br />$8,670.00 <br />$5,000.00 <br />$5,419.00 <br />$5,419.00 <br />$16,000.00 <br />$95.001 <br />$30,400.00 <br />uerra Construction <br />$5,000.00 <br />34 Memorex Drive <br />Livermore, Ca 94550 <br />anta Clara, CA 95050 <br />hone: (408) 279-2027 <br />ax: (408) 279-2044 <br />1 $9,500-001 <br />$9,500.00 <br />UNIT COST <br />ITEM COST <br />$560.00 <br />$260.00 <br />$14,000.00 <br />$60.00 <br />$32.23 <br />$27,000.00 <br />$4,500.00 <br />$5,500.00 <br />$4,500.00 <br />$90.00 <br />$85.72 <br />$31,500.00 <br />$45.00 <br />$125.00 <br />$5,400.00 <br />$67.00 <br />$86.96 <br />$15,410.00 <br />$39.00 <br />$42.00 <br />$9,750.00 <br />$45.00 <br />$150.00 <br />$4,500.00 <br />$560.00 <br />$425.00 <br />$13,440.00 <br />$8,900.00 <br />$25,000.00 <br />$8,900.00 <br />$5,600.00 <br />$12,000.00 <br />$5,600.00 <br />$98.00 <br />$111.00 <br />$31,360.00 <br />RGW Construction <br />$5,000.00 <br />550 Greenville Road <br />Livermore, Ca 94550 <br />Phone: (925)606-2400 <br />Fax: (925) 961-1925 <br />$11,100.00 <br />1 $9,500-001 <br />$9,500.00 <br />UNIT COST <br />$15,000.00 <br />ITEM COST <br />$260.00 <br />$29,000.00 <br />$6,500.00 <br />$32.23 <br />$27,000.00 <br />$14,503.50 <br />$5,500.00 <br />$50,000.00 <br />$5,500.00 <br />$85.72 <br />$62,700.00 <br />$30,002.00 <br />$125.00 <br />$37,500.00 <br />$15,000.00 <br />$86.96 <br />$20,000.80 <br />$42.00 <br />$10,500.00 <br />$150.00 <br />B3 <br />$15,000.00 <br />$425.00 <br />$10,000.00 <br />$10,200.00 <br />$25,000.00 <br />$2,600.00 <br />$25,000.00 <br />$12,000.00 <br />$8,500.00 <br />$12,000.00 <br />$111.00 <br />Detectable Truncated Domes <br />$35,520.00 <br />1 LS <br />$5,000.00 <br />$5,000.00 <br />$10,800.001 <br />$10,800.00 <br />1 $11,100.001 <br />$11,100.00 <br />1 $9,500-001 <br />$9,500.00 <br />1 LS <br />$15,000.00 <br />$15,000.00 <br />$29,000.00 <br />$29,000.00 <br />$22,500.00 <br />$22,500.00 <br />$27,000.00 <br />$27,000.00 <br />1 LS <br />$50,000.00 <br />$50,000.00 <br />$62,700.00 <br />$62,700.00 <br />1 $121,000.00 <br />$121,000.00 <br />$37,500.00 <br />$37,500.00 <br />TOTAL ADDITIVE BID ITEM A: <br />$211,300.00 <br />$290,342.00 <br />$364,960.00 <br />$305,726.30 <br />ADDITIVE BID ITEM B <br />B1 <br />Mobilization and General Conditions <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$300.00 <br />$300.00 <br />$2,800.00 <br />$2,800.00 <br />$5,000.00 <br />$5,000.00 <br />B2 <br />Stormwater pollution prevention <br />1 <br />$1,000.00 <br />$1,000.00 <br />$350.00 <br />$350.00 <br />$1,200.00 <br />$1,200.00 ** <br />$500.00 <br />$500.00 <br />LS <br />B3 <br />Demolition -Offsite <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$2,600.00 <br />$2,600.00 <br />$1,700.00 <br />$1,700.00** <br />$8,500.00 <br />$8,500.00 <br />B4 <br />Detectable Truncated Domes <br />18 SF <br />$35.00 <br />$630.00 <br />$50.00 <br />$900.00 <br />1$60.00 <br />$1,080.00 <br />$100.00 <br />$1,800.00 <br />B5 <br />Deduct Base bid curb ramp and base <br />1 EA <br />($4,200.00) <br />($4,200.00) <br />($1,350.00) <br />($1,350.00) <br />($3,000.00) <br />($3,000.00) <br />($3,500.00) <br />($3,500.00) <br />(Same as Bid Item 30) <br />B6 <br />Concrete paving - Pedestrian <br />83 SF <br />$12.00 <br />$996.00 <br />$13.00 <br />$1,079.00 <br />$12.00 <br />$996.00 <br />$23.00 <br />$1,909.00 <br />Siempre Verde Park Rehab - Bid Summary Page 4 of 12 Printed 8/4/2015 @ 4:49 PM <br />