BID SUMMARY
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270
<br />BID NO.: 14-15.025
<br />BID OPENING ENGINEER'S ESTIMATE RobertA. Bothman, Inc.
<br />DATE: Monday, August 3, 2015 Date Approved: 6/17/2015 2690 Scott Boulevard
<br />TIME: 3:00 p.m. Prepared by: Kyle Lei Santa Clara, CA 95050
<br />LOCATION: City Clerk's Office
<br />ITEM
<br />NO. ITEM
<br />A2 30 -inch Diameter Conductor Casing
<br />A3 8 -1/4 -inch Diameter Pilot Bore
<br />A4 Electric Resistance and Gamma Ray
<br />Logging (E -log)
<br />A5 17 -1/4 -inch Diameter Final Bore
<br />A6 Install 8 -inch Diameter SDR17 PVC
<br />Casing
<br />A7 Install 8 -inch Diameter SDR17 PVC
<br />Screens
<br />A8 Install 1/4" x No. 10 Filter Pack
<br />A9 Install 10 -sack Sanitary Seal
<br />A10 Well Development
<br />A11 Pump Testing
<br />Al2 Construct Wellhead Pedestal
<br />A13 Install 3 -inch Diameter PVC Drop Pipe,
<br />Downhole Power Conductors, Tag Line
<br />and Sounding Tube
<br />A14 Install Submersible Pump
<br />A15 Install Wellhead Piping and Hydro -
<br />pneumatic System
<br />A16 Install Electrical Service and Controls
<br />QUANTITY
<br />25 LF
<br />450 LF
<br />1 LS
<br />350 LF
<br />120 LF
<br />230 LF
<br />250 LF
<br />100 LF
<br />24 HOUR
<br />1 LS
<br />1 LS
<br />320 LF
<br />UNIT COST
<br />$17
<br />$1
<br />uerra Construction
<br />Phone: (408)279-2277
<br />34 Memorex Drive
<br />Fax: (408) 279-2286
<br />anta Clara, CA 95050
<br />hone: (408) 279-2027
<br />ax: (408) 279-2044
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />$6,250.00
<br />$542.00
<br />$13,550.00
<br />$27,000.00
<br />$55.00
<br />$24,750.00
<br />$3,500.00
<br />$4,335.00
<br />$4,335.00
<br />$22,750.00
<br />$87.00
<br />$30,450.00
<br />$4,800.00
<br />$44.00
<br />$5,280.00
<br />$11,500.00
<br />$66.00
<br />$15,180.00
<br />$2,500.00
<br />$38.00
<br />$9,500.00
<br />$7,500.00
<br />$44.00
<br />$4,400.00
<br />$12,000.00
<br />$542.00
<br />$13,008.00
<br />$17,500.00
<br />$8,670.00
<br />$8,670.00
<br />$5,000.00
<br />$5,419.00
<br />$5,419.00
<br />$16,000.00
<br />$95.001
<br />$30,400.00
<br />uerra Construction
<br />$5,000.00
<br />34 Memorex Drive
<br />Livermore, Ca 94550
<br />anta Clara, CA 95050
<br />hone: (408) 279-2027
<br />ax: (408) 279-2044
<br />1 $9,500-001
<br />$9,500.00
<br />UNIT COST
<br />ITEM COST
<br />$560.00
<br />$260.00
<br />$14,000.00
<br />$60.00
<br />$32.23
<br />$27,000.00
<br />$4,500.00
<br />$5,500.00
<br />$4,500.00
<br />$90.00
<br />$85.72
<br />$31,500.00
<br />$45.00
<br />$125.00
<br />$5,400.00
<br />$67.00
<br />$86.96
<br />$15,410.00
<br />$39.00
<br />$42.00
<br />$9,750.00
<br />$45.00
<br />$150.00
<br />$4,500.00
<br />$560.00
<br />$425.00
<br />$13,440.00
<br />$8,900.00
<br />$25,000.00
<br />$8,900.00
<br />$5,600.00
<br />$12,000.00
<br />$5,600.00
<br />$98.00
<br />$111.00
<br />$31,360.00
<br />RGW Construction
<br />$5,000.00
<br />550 Greenville Road
<br />Livermore, Ca 94550
<br />Phone: (925)606-2400
<br />Fax: (925) 961-1925
<br />$11,100.00
<br />1 $9,500-001
<br />$9,500.00
<br />UNIT COST
<br />$15,000.00
<br />ITEM COST
<br />$260.00
<br />$29,000.00
<br />$6,500.00
<br />$32.23
<br />$27,000.00
<br />$14,503.50
<br />$5,500.00
<br />$50,000.00
<br />$5,500.00
<br />$85.72
<br />$62,700.00
<br />$30,002.00
<br />$125.00
<br />$37,500.00
<br />$15,000.00
<br />$86.96
<br />$20,000.80
<br />$42.00
<br />$10,500.00
<br />$150.00
<br />B3
<br />$15,000.00
<br />$425.00
<br />$10,000.00
<br />$10,200.00
<br />$25,000.00
<br />$2,600.00
<br />$25,000.00
<br />$12,000.00
<br />$8,500.00
<br />$12,000.00
<br />$111.00
<br />Detectable Truncated Domes
<br />$35,520.00
<br />1 LS
<br />$5,000.00
<br />$5,000.00
<br />$10,800.001
<br />$10,800.00
<br />1 $11,100.001
<br />$11,100.00
<br />1 $9,500-001
<br />$9,500.00
<br />1 LS
<br />$15,000.00
<br />$15,000.00
<br />$29,000.00
<br />$29,000.00
<br />$22,500.00
<br />$22,500.00
<br />$27,000.00
<br />$27,000.00
<br />1 LS
<br />$50,000.00
<br />$50,000.00
<br />$62,700.00
<br />$62,700.00
<br />1 $121,000.00
<br />$121,000.00
<br />$37,500.00
<br />$37,500.00
<br />TOTAL ADDITIVE BID ITEM A:
<br />$211,300.00
<br />$290,342.00
<br />$364,960.00
<br />$305,726.30
<br />ADDITIVE BID ITEM B
<br />B1
<br />Mobilization and General Conditions
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$300.00
<br />$300.00
<br />$2,800.00
<br />$2,800.00
<br />$5,000.00
<br />$5,000.00
<br />B2
<br />Stormwater pollution prevention
<br />1
<br />$1,000.00
<br />$1,000.00
<br />$350.00
<br />$350.00
<br />$1,200.00
<br />$1,200.00 **
<br />$500.00
<br />$500.00
<br />LS
<br />B3
<br />Demolition -Offsite
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$2,600.00
<br />$2,600.00
<br />$1,700.00
<br />$1,700.00**
<br />$8,500.00
<br />$8,500.00
<br />B4
<br />Detectable Truncated Domes
<br />18 SF
<br />$35.00
<br />$630.00
<br />$50.00
<br />$900.00
<br />1$60.00
<br />$1,080.00
<br />$100.00
<br />$1,800.00
<br />B5
<br />Deduct Base bid curb ramp and base
<br />1 EA
<br />($4,200.00)
<br />($4,200.00)
<br />($1,350.00)
<br />($1,350.00)
<br />($3,000.00)
<br />($3,000.00)
<br />($3,500.00)
<br />($3,500.00)
<br />(Same as Bid Item 30)
<br />B6
<br />Concrete paving - Pedestrian
<br />83 SF
<br />$12.00
<br />$996.00
<br />$13.00
<br />$1,079.00
<br />$12.00
<br />$996.00
<br />$23.00
<br />$1,909.00
<br />Siempre Verde Park Rehab - Bid Summary Page 4 of 12 Printed 8/4/2015 @ 4:49 PM
<br />
|