My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent 2015 0908
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0908
>
8O Consent 2015 0908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 2:02:12 PM
Creation date
9/2/2015 11:52:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/8/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0908 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0908
Reso 2015-153
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: September 8, 2015 <br />Staff Report <br />Agenda Section:File Number:15-485 CONSENT CALENDAR <br />Agenda Number:8.O. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Authorizing the City Manager to Negotiate and <br />Approve Individual Change Orders Up to 10% of the Original Contract <br />Amount; and Authorizing the City Manager to Negotiate and Approve <br />Cumulative Change Orders up to 25% of the Original Contract Amount on <br />Existing Construction Contracts with All Phase Excavation and Construction, <br />American Asphalt, Chrisp Company, Columbia Electric, Conquest, DeSilva <br />Gates, Flatiron Electric Group, Gallagher and Burk, McGuire and Hester, <br />Ray’s Electric, and S.J. Amoroso Construction Co., Inc. <br />SUMMARY AND RECOMMENDATIONS <br />Authorizes the City Manager or his designee to negotiate and approve change orders up to <br />certain limits on specific existing construction contracts. <br />Staff recommends granting the City Manager or his designee the authority to negotiate and <br />approve individual change orders and cumulative change orders as described. <br />BACKGROUND <br />Attached is a list of active contracts with outside firms for construction of capital <br />improvements. Change orders to clarify the work or respond to atypical existing conditions <br />are a normal aspect of public contracting and construction due to the nature of the work, as <br />described below. <br />Existing conditions at each construction site are investigated during the project design phase. <br />Because it is expensive to check every item and sample every material, representative <br />samples are taken and records of previous construction at the site are reviewed. For each <br />project, the effort and cost of site investigation during design is balanced against the risk and <br />cost of finding unforeseen conditions during construction. <br />Plans and specifications that describe the work to be done on construction projects are <br />Page 1 City of San Leandro Printed on 9/2/2015
The URL can be used to link to this page
Your browser does not support the video tag.