My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent 2015 0908
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0908
>
8O Consent 2015 0908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 2:02:12 PM
Creation date
9/2/2015 11:52:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/8/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0908 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0908
Reso 2015-153
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Active Construction Contracts <br />Project No.Project Contractor <br /> Original <br />Contract Amount <br />Max Change Order <br />Amount (25%) <br />2013.027 Fiber Loop City Hall to Main Library All Phase Excavation and Construction $62,990 $15,748 <br />2015.007 Annual Street Sealing 2014-15 American Asphalt $374,805 $93,701 <br />2013.016 San Leandro Bikeway East Imp.Chrisp Company $180,359 $45,090 <br />11-150-28-190 Washington Monterey Traffic Signal Columbia Electric $269,441 $67,360 <br />2013.012 Sanitary Sewer Line Replace./Repair Conquest $1,114,310 $278,578 <br />2014.042 San Leandro Blvd Rehab DeSilva Gates $1,178,644 $294,661 <br />2013.0320 Fiber Conduit for Broadband Network Flatiron Electric Group $1,325,350 $331,338 <br />2014.005 Annual Street Overlay/Rehab 13-14 Gallagher and Burk $1,012,665 $253,166 <br />11-150-38-331 BART-Downtown Pedestrian Imp Gallagher and Burk $4,846,700 $1,211,675 <br />2014.05 West Juana Pedestrian Improvements McGuire and Hester $762,800 $190,700 <br />2012.022 APS Upgrade 2012 Ray’s Electric $371,000 $92,750 <br />08-593-52-239 Water Pollution Control Plant Rehab S.J. Amoroso Construction Co., Inc.$40,127,000 $10,031,750
The URL can be used to link to this page
Your browser does not support the video tag.