Laserfiche WebLink
5. Manufacturer’s specification sheets for the proposed antennas and ancillary <br />equipment. <br /> <br />6. Photographs of the existing site conditions, as well as the surrounding land <br />uses. <br /> <br />7. A copy of the carrier’s current FCC license. <br /> <br />8. A stamped and signed radio-frequency report prepared by a qualified engineer. <br /> <br />9. A written description of the proposed project, including a description of the type <br />of proposed installation and the location and dimensions of the proposed <br />antennas, antenna support structures, and all ancillary equipment. <br /> <br />10. For treepoles, provide bark cladding and branch with leaf/needle samples for <br />review and selection. <br /> <br />In addition to the requirements listed above, each applicant submitting a <br />Conditional Use Permit application under this Ordinance shall submit the following <br />additional application materials: <br /> <br />11. A five (5) year master plan, drawn to a reasonable scale, for all of the <br />applicant’s existing, planned or reasonably anticipated wireless <br />telecommunications facility locations within the jurisdiction of the City or within <br />one-quarter mile of the border thereof, indicating the service area covered by <br />each such facility and including specific information about the location, height, <br />and design of each facility. <br /> <br />12. An alternatives analysis that demonstrates what other sites were considered <br />by the carrier within the coverage area. <br /> <br />13. Radio-Frequency Emissions. Within thirty (30) calendar days of activation of <br />the facility, the applicant shall submit a Radio-Frequency Compliance Report <br />demonstrating that the facility meets the FCC standards for radio-frequency <br />emissions. This report is required in order to verify compliance with prevailing <br />standards for public exposure and will be prepared by a qualified engineer. <br />Such documentation shall include the following: <br /> <br />a. The make and model (or other identifying information) of the equipment <br />tested; <br /> <br />b. The date and time of the inspection and the methodology used to make <br />the determination; <br /> <br />Proposed Amended Article 16 <br /> <br />Note: underlined and bolded text represents new text; strike through represents text to be eliminated Page 17