Laserfiche WebLink
N. If the facility stores petroleum products, including mixtures with any concentration of <br /> petroleum, in a quantity equal to or greater than 1.320 gallons as an aggregate of all <br /> individual aboveground "tanks" equal to or greater than 55 gallons capacity (including <br /> drums, tanks, containers, totes, oil-filled electrical equipment, oil-filled manufacturing <br /> equipment and oil-filled operational equipment), the facility must comply with the <br /> requirements of the CA Aboveground Petroleum Storage Act(APSA) as required in Ch 6.67 <br /> of the CA Health & Safety Code and implement a Spill Prevention Control and <br /> Countermeasure Plan(SPCC)in conformance with 40 CFR 112. <br /> U. If vehicle washing will be performed onsite,a properly sized interceptor shall be installed and <br /> maintained to pretreat discharges to the sanitary sewer. No domestic wastewater may <br /> discharge through interceptors. A plumbing permit shall be obtained from the City for <br /> installation. <br /> P. Accessible and secure monitoring facilities may be required at the site's final combined <br /> sanitary sewer outfall to allow for the City to periodically install sampling equipment and <br /> collect wastewater samples to determine the facility's compliance with wastewater discharge <br /> regulations. <br /> VI. ENGINEERING and TRANSPORTATION REQUIREMENTS <br /> A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the City <br /> HEREBY NOTIFIES the applicant for this Project that the 90-day approval period (in which <br /> the applicant may protest the imposition of any fees, dedications. reservations, or other <br /> exactions imposed on this Project by these Conditions of Approval) will begin on the date of <br /> the conditional approval of this Project. If you fail to file a protest within this 90-day period, <br /> complying with all of the requirements of Government Code Section 66020, you will be <br /> legally barred from later challenging any such fees, dedications, reservations or other <br /> exactions. <br /> B. The proposed development shall comply with City ordinances, policies and regulations. All. <br /> improvements shall be in accordance with the City's Design Standards, Specifications and <br /> Standard Plans unless otherwise specifically approved by the City Engineer. <br /> C. The applicant shall pay design review fees, permit fees, inspection fees, sewer connection <br /> fees, and any other fees charged by the City or other reviewing agencies for the review, <br /> approval,permitting and inspection of the public and/or private improvements. <br /> D. The applicant shall pay the Development Fee for Street Improvements (DFSI) prior to <br /> issuance of a building permit; credit will be given for the existing industrial space. The DFSI <br /> fee for personal services will apply. The estimated DFSI fee is $18,051.29 including credits. <br /> E. The applicant shall obtain an Encroachment Permit from the Engineering and Transportation <br /> Department and pay encroachment permit fees for any work within the public right-of-way <br /> prior to the issuance of building permits for the project. <br /> Agreement to Conditions December 4,2014 <br /> PLN2014-00026 Page 7 of 10 <br />