Laserfiche WebLink
3.Work Program/Project Schedule <br /> Task 3.2- Final Master Plan and Response to The final document will be a graphically rich <br /> Comments document that can be readily understood <br /> All comments will be clearly documented in a and appreciated by a wide variety of readers. <br /> table, stating the comment, and location of The document and response table will also be <br /> the comment in the report and commenter. valuable in providing consensus about the final <br /> Revisions to the document will be made or recommendations. <br /> where revisions are not feasible or possible, <br /> details explaining why will be provided. This Task 4 - Plan Presentation <br /> provides an easy to read supplement to the We will prepare a presentation in consultation <br /> final report and will provide reasoning back to with the project team for delivery to City <br /> the original commenter if we their desires were Council of both the cities of San Leandro and <br /> unable to be fully met. Oakland. The presentation will summarize <br /> the trail master plan, including technical <br /> A final report, incorporating all final revisions, will recommendations, and the next steps. We will <br /> be prepared in PDF format. Up to five copies prepare the PowerPoint presentation that is <br /> are also assumed to be needed. Additional suitable for this venue, and prepare the draft <br /> printed copies can also be provided as staff report. These will be submitted to the City <br /> negotiated. staff two weeks prior to the scheduled council <br /> meetings. <br /> OC Loop Feasibility Report Agency Responses <br /> Date Page Agency Comment Response <br /> Figure 7.15 and 7,16:add periods to end of Captions are not complete <br /> 3-9-15 1107(103) Paul,OCTA sentences.Punctuation not <br /> captions provided. <br /> Page 104,in the legend:replace "existing trail" Trail changed to bikeway in <br /> 2-20-15 108(104) Jeff Dickman, with"existing Class I Bikeway"and "proposed legend but proposed facility <br /> OC Public Works trail"with "proposed Class I Bikeway,Class II types not differentiated <br /> Bike Lane or Class IV Cycle Track" (consistency with other figures). <br /> Please add"existing riding and hiking trail" <br /> along Fairlynn Boulevard and along Esperanza <br /> Jeff Dickman, <br /> Road but only within the unincorporated <br /> 2-20-15 j 108(104) lands;add"proposed riding and hiking trail" Added to text and to figure. <br /> OC Public Works along incorporated portion of Esperanza <br /> Road,along the Fairmont Connector and <br /> Fairmont Boulevard" <br /> Page 105 Fairmont Connector from Esperanza <br /> Road to Fairmont Boulevard:Review Fairmont <br /> 2-20-15 : 109(105) Yorba Linda, Connector vehicle volume from 6,000 to 4,000 Revised per comments. <br /> City of vehicles per day;revise vehicle volume source <br /> from 2008 to 2014 <br /> Page 105 Fairmont Connector from Esperanza <br /> Yorba Linda, Road to Fairmont Boulevard:The parking <br /> 2-17-15 109(105) City of on Fairmont is used by the residents of the Revised per comments. <br /> adjacent condominium complex and not the <br /> Canyon Hills Friends Church <br /> Stantec Proposal for San Leandro Creek Tra,Master Plan 41 <br />