My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2015 1207
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 1207
>
8G Consent 2015 1207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:24:41 AM
Creation date
12/2/2015 5:35:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/7/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 1207 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 1207
Reso 2015-185
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: December 7, 2015 <br />Staff Report <br />File Number: 15-597 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.G. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Awarding a Construction Contract to Rosas <br />Brothers Construction for the Annual Sidewalk Repair Program 2015-16, <br />Project No. 2016.0060 <br />SUMMARY AND RECOMMENDATIONS <br />The project provides for the removal and replacement of damaged concrete sidewalks, <br />driveway approaches, curbs and gutters, and the installation of sidewalk curb ramps <br />throughout the City. <br />Staff recommends award of the construction contract to Rosas Brothers Construction in the <br />amount of $273,945.00 for the subject project. <br />Staff also requests City Council authorization to negotiate and approve cumulative contract <br />change orders up to a maximum of $68,486, which is 25% of the original contract amount. <br />BACKGROUND <br />Property owners are required by the San Leandro Municipal Code to maintain the sidewalks <br />along their property frontage. The City's sidewalk maintenance requirements are specified in <br />the Sidewalk Repair Program, Title 8 of the San Leandro Administrative Code, which provides <br />for the repair of damaged sidewalks. When the City is informed about damaged sidewalks in <br />the public right-of-way, staff examines the area to determine whether repairs or replacement <br />will be required. Minor sidewalk defects are repaired by grinding or patching at no charge to <br />the adjacent property owners. Larger defects that require removal and replacement of either <br />the sidewalks or driveway approaches are also repaired under the Program, but the property <br />owners adjacent to such defects must reimburse the City for the full costs unless a City street <br />tree is the cause. If a City street tree is the cause of the defects, then the costs are divided <br />evenly between property owners and the City. <br />In addition to the repair of sidewalks, this project will install sidewalk curb ramps to meet <br />City of San Leandro Page 1 Printed on 12/1/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.