Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
F SAN. Fq <br />'. ieaNSFRRµ.i7v4N <br />APO RgSE� <br />PROJECT TITLE: Annual Sidewalk Repair Program 2015-16 <br />PROJECT NO.: 2016.0060 <br />BID NO.: 15-16.002 <br />BID SUMMARY <br />Fhis document is a summary of bids received for the subject project and are <br />)rovided only as a convenience. Listing of a particular bid is not a finding that <br />,uch bid has been found to be responsive or accepted as complete by the City. <br />%n award of contract, if any, is subject to approval of the City Council and/or the <br />:ity Manager. Contractors should refer to the contract documents for bidding <br />nformation. <br />BID OPENING <br />DATE: September 16, 2015 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 8/18/2015 <br />Prepared by: A. Osakwe <br />Rosas Brothers Construction <br />4731 Coliseum Way <br />Oakland, CA 94601 <br />Phone: (510) 534-1077 <br />Fax: (510) 534-5077 <br />Sposeto Engineering, Inc. <br />4558 Contractors Place <br />Livermore, CA 94551 <br />Phone: (925) 443-4300 <br />Phone: (925) 443-5800 <br />JJR Construction, Inc. <br />1120 Ninth Avenue <br />San Mateo, CA 94402 <br />Phone: (650) 343-6109 <br />Fax: (650) 343-6207 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />Phone: <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Install curb and gutter per drawing <br />800 LF <br />$53.00 <br />$42,400.00 <br />$60.00 <br />$48,000.00 <br />$96.00 <br />$76,800.00 <br />$200.00 <br />$160,000.00 <br />100 case 3101 <br />2 <br />Install sidewalk per drawing 100 <br />6500 SF <br />$13.00 <br />$84,500.00 <br />$13.00 <br />$84,500.00 <br />$16.00 <br />$104,000.00 <br />$35.00 <br />$227,500.00 <br />case 3101 <br />3 <br />Install 6" driveway per drawing <br />2000 SF <br />$14.00 <br />$28,000.00 <br />.$16.00 <br />$32,000.00 <br />$16.00 <br />$32,000.00 <br />$45.00 <br />$90,000.00 <br />102 or drawing 110 case 3101 <br />4 <br />Install 8" driveway per drawing <br />600 SF <br />$17.00 <br />$10,200.00 <br />$18.00 <br />$10,800.00 <br />$17.00 <br />$10,200.00 <br />$55.00 <br />$33,000.00 <br />102 or drawing 110 case 3101 <br />5 <br />Install wheelchair curb cut ramp <br />2500 SF <br />$17.00 <br />$42,500.00 <br />$17.00 <br />$42,500.00 <br />$26.00 <br />$65,000.00 <br />$45.00 <br />$112,500.00 <br />per drawing 106A and B case <br />3101 <br />6 <br />Install depressed driveway <br />180 SF <br />$15.00 <br />$2,700.00 <br />$16.50 <br />$2,970.00 <br />$24.00 <br />$4,320.00 <br />$55.00 <br />$9,900.00 <br />approach per drawing 108 case <br />3101 <br />7 <br />Install basket weave sidewalk per <br />300 SF <br />$15.00 <br />$4,500.00 <br />$15.00 <br />$4,500.00 <br />$45.00 <br />$13,500.00 <br />$45.00 <br />$13,500.00 <br />drawing 112 case 3101 <br />8 <br />Install valley gutter per drawing <br />240 SF <br />$19.00 <br />$4,560.00 <br />$25.00 <br />$6,000.00 <br />$28.00 <br />$6,720.00 <br />$40.00 <br />$9,600.00 <br />114 case 3101 <br />9 <br />Install stamped concrete paving <br />100 SF <br />$21.50 <br />$2,150.00 <br />$20.00 <br />$2,000.00 <br />$36.00 <br />$3,600.00 <br />$65.00 <br />$6,500.00 <br />per drawing 116 case 3101 <br />10 <br />Install vertical curb per drawing <br />50 LF <br />$40.00 <br />$2,000.00 <br />$50.00 <br />$2,500.00 <br />$80.00 <br />$4,000.00 <br />$75.00 <br />$3,750.00 <br />118 case 3101 <br />11 <br />Grind raised concrete sidewalk to <br />100 LF <br />$47.00 <br />$4,700.00 <br />$20.00 <br />$2,000.00 <br />$32.00 <br />$3,200.00 <br />$200.00 <br />$20,000.00 <br />flush with adjacent grade, within <br />48 hrs of notification <br />12 <br />Install cast iron pipe curb drain <br />40 LF <br />$35.00 <br />$1,400.00 <br />$20.00 <br />$800.00 <br />$60.00 <br />$2,400.00 <br />$200.00 <br />$8,000.00 <br />per drawing 212 case 3101 <br />Bid Summary - Annual Sidewalk Repair Program 2015-16 Page 1 of 3 Printed 9/16/2015 @ 4:05 PM <br />