My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2015-050
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2015
>
MO 2015-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2015 3:41:51 PM
Creation date
12/16/2015 3:39:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/7/2015
Retention
PERM
Document Relationships
8K Consent 2015 1207
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 1207
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Bay Greenway <br /> <br /> <br />The East Bay Greenway is a unique regional project that will <br />provide a north-south bicycle and pedestrian connection to the <br />189,000 residents of Oakland, San Leandro and Hayward who <br />live, work, or attend school nearby. This project offers a much <br />-needed recreational and transportation opportunity in close <br />proximity to densely populated neighborhoods, schools, retail <br />areas, community centers, industrial areas and transit hubs. <br /> <br />Greenway Project Overview <br />The East Bay Greenway is planned to be a well-lighted, beau- <br />tifully landscaped pedestrian and bicycle path connecting five <br />Bay Areas Rapid Transit (BART) stations. With play areas and <br />other community amenities, the currently neglected space will <br />be transformed into a community asset that brings people to- <br />gether in healthier, safer, and stronger communities. <br /> <br />The 15-mile East Bay Greenway passes through four jurisdic- <br />tions: Oakland, San Leandro, unincorporated Alameda County, <br />and Hayward. It will run along and adjacent to the BART elevated “A” Line within the Oakland Subdivision <br />railway, parallel to the San Francisco Bay Trail and the Ridge Trail. The Greenway will serve as an urban <br />counterpart to these existing recreational routes. <br /> <br />In order to make the Greenway comfortable and inviting for inexperienced and/or beginning cyclists, the <br />Greenway is designed as a separated multi-use pathway (Class I bike path) for as much of the route as pos- <br />sible. This project would be accomplished with the acquisition and conversion of the adjacent rail line. <br />Greenway Funding Request <br />Probable land acquisition and construction cost for the 3.5 mile San Leandro section of the project is approxi- <br />mately $28 million. The acquisition and construction cost of the entire 15-mile long project is approximately <br />$94 million. Alameda County voters authorized Measure BB in November 2014, which will provide sufficient <br />funds for grant matching requirements. Federal funding would allow the project to move forward. <br />Greenway <br />Creek Walk
The URL can be used to link to this page
Your browser does not support the video tag.