My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2016 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0119
>
8C Consent 2016 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 2:45:59 PM
Creation date
1/14/2016 5:13:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0119 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0119
Reso 2016-007
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: January 19, 2016 <br />Staff Report <br />Agenda Section:File Number:15-709 CONSENT CALENDAR <br />Agenda Number:8.C. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Approving a Consulting Services Agreement with <br />Towill, Inc. for Surveying Services on the Water Pollution Control Plant <br />Asphalt Replacement Project, Project 2015.0260 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends approval of an agreement with Towill, Inc. for surveying services on the <br />Water Pollution Control Plant (WPCP) Asphalt Replacement project. <br />BACKGROUND <br />The WPCP has been in service for over 70 years and many of its components were recently <br />replaced or upgraded over the past three years as a part of the WPCP Rehabilitation Project. <br />A portion of the asphalt paving at the WPCP was planned for replacement upon completion of <br />the Rehabilitation Project and a portion is at the end of its useful life and needs to be <br />replaced. <br />A topographic survey to document locations and elevations of existing improvements including <br />underground utilities is required before elevations and slopes of new paving can be <br />determined. Additionally, a topographic survey of the eastern end of the canal that bounds <br />the WPCP to the south is needed to evaluate what actions are necessary to keep water from <br />the San Francisco Bay from entering the site under flood conditions. <br />Finally, a measure of the volume of dirt stockpiled and available for re-use on site is needed <br />to accurately describe the extent of work to be done on the WPCP dirt relocation project. <br />Analysis <br />A Request for Proposals was issued for this work and two responses were received. The <br />selected consultant, Towill, Inc. has the necessary experience and moreover has recently <br />completed similar work for the WPCP Rehabilitation project. The subject work met the needs <br />Page 1 City of San Leandro Printed on 1/12/2016
The URL can be used to link to this page
Your browser does not support the video tag.