My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2016 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0119
>
8C Consent 2016 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 2:45:59 PM
Creation date
1/14/2016 5:13:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0119 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0119
Reso 2016-007
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Towill, Inc. <br />WPCP AC Pavement Rehabilitation Page 13 of 15 <br /> <br />10.9 Contract Administration. This Agreement shall be administered by Nick Thom ("Contract <br />Administrator"). All correspondence shall be directed to or through the Contract <br />Administrator or his or her designee. <br /> <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Towill,Inc. <br />Attn: John May <br />2300 Clayton Road, Suite 1200 <br />Concord, CA 94520 <br /> <br />Any written notice to City shall be sent to: <br />City of San Leandro <br />Engineering & Transportation Department <br />Attn: Nick Thom <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Technician <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br /> <br /> <br /> <br /> <br />_________________________________________ <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br /> <br /> <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, and C and D represents the entire and integrated <br />agreement between City and Consultant and supersedes all prior negotiations, <br />representations, or agreements, either written or oral. <br /> <br />Exhibit A Scope of Services <br />Exhibit B Compensation Schedule
The URL can be used to link to this page
Your browser does not support the video tag.