My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2016 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0119
>
8C Consent 2016 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 2:45:59 PM
Creation date
1/14/2016 5:13:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0119 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0119
Reso 2016-007
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Towill, Inc. <br />for WPCP AC Pavement Rehabilitation Exhibit A – Page 1 of 3 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Project Description: <br />The City has a project to replace approximately 12,300 square yards of AC pavement at the Water Pollution <br />Control Plant (WPCP) at 3000 Davis St, San Leandro, CA. Work will include new aggregate base as well <br />regrading required to improve storm drainage and transitions to existing improvements. <br /> <br />Additionally, the City has a project to create an equipment pad by partially filling an old polishing pond with <br />earth that is currently stockpiled on site. <br /> <br />Finally, the City is interested in documenting existing topography and grades on the north side of the slough <br />that connects Davis Street with the San Francisco Bay for the purpose of determining work necessary to <br />reduce the risk of Bay water overtopping the bank of the slough. <br /> <br />Scope of Work: <br />The Consultant shall prepare a topographic survey that will facilitate design of the new pavement, document <br />the volume of soil in the stockpile, and document the height, width, and location of existing improvements along <br />a portion of the north side of the slough. Areas to be surveyed are shown in figure 1. <br /> <br />The Consultant’s scope of work includes the following tasks: <br /> <br /> Task 1 – Preparatory Work <br /> <br />1) Review City provided information and attend an initial meeting with City staff in person or by phone <br />to verify scope of work and project approach and to review any modifications that may result in cost <br />saving. <br /> <br />2) Perform an overall site visit prior to start of work. <br /> <br />3) Perform general project administration. <br /> <br />Task 2 – Topographic Mapping <br /> <br />1) Measure topographic features such as top and toes of slopes, grade breaks and at intervals of <br />approximately 25 feet. <br /> <br />2) Measure features within the project area such as curbs, walks, driveways, structures, trees, edges <br />of pavement, edges of slabs, and high and low points. <br /> <br />3) Measure all utility structures within the project areas such as poles, manholes, catch basins, vaults, <br />valves, meters, process facilities, and fire hydrants. <br /> <br />4) Provide underground field utility locating services for area of AC paving. Three 8-hours days are <br />included for this task.
The URL can be used to link to this page
Your browser does not support the video tag.