My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Architectural Resources Group Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Architectural Resources Group Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:49:12 AM
Creation date
1/26/2016 2:43:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/21/2015
Retention
PERM
Document Relationships
Reso 2015-199
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or <br />interview related to this Agreement, either orally or through any written materials. <br />10.9 Contract Administration. This Agreement shall be administered by Kyle K. Lei ("Contract <br />Administrator"). All correspondence shall be directed to or through the Contract <br />Administrator or his or her designee. <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Naomi 0. Miroglio <br />Architectural Resources Group, Inc. <br />Pier 9, The Embarcadero <br />Suite 107 <br />San Francisco, CA 94111 <br />Any written notice to City shall be sent to: <br />Kyle K. Lei <br />Engineering and Transportation Department <br />City of San Leandro <br />835 E. 14th Street <br />San Leandro, CA 94577 <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Technician <br />835 East 14th Street <br />San Leandro, CA 94577 <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, and C and D represents the entire and integrated <br />Consulting Services Agreement between City of San Leandro and 11/25/2015 <br />Architectural Resources Group, Inc. Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.