My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Architectural Resources Group Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Architectural Resources Group Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:49:12 AM
Creation date
1/26/2016 2:43:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/21/2015
Retention
PERM
Document Relationships
Reso 2015-199
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
include assessment of building use, envelope, systems, circulation, access & egress, building interior finish, <br />and building/site furnishings. The cost estimate shall include structural repairs if any is needed. <br />Deliverables shall be due within ten weeks after both the conditions assessment and public outreach <br />meeting are completed and shall include: <br />• Draft document outlining use of building and site, scope of work for improvements, code analysis, <br />and project phasing options (sent electronically as a PDF) <br />• Draft site plan showing land use, access, circulation, and site features (sent electronically as a <br />PDF and also in CAD if drawings were prepared using CAD software) <br />• Draft floor plans and elevations to show building use, access and egress (sent electronically as a <br />PDF and also in CAD if drawings were prepared using CAD software). A maximum of two <br />schemes shall be provided as part of the contract scope <br />• Preliminary cost estimate of each design scheme (sent electronically as a Microsoft Excel <br />document). <br />7. Draft Review Meeting <br />Consultant shall meet with City staff to review and discuss the draft project documents. City staff will <br />prepare the meeting minutes and send a copy to the Consultant. The draft review meeting shall be held <br />within two weeks after the draft deliverables are submitted. <br />8. Prepare Final Conceptual Plans and Cost Estimates <br />Consultant shall prepare the final conceptual drawings and cost estimates based on comments from the <br />draft review meeting. The final documents shall be submitted within one month after the draft review <br />meeting. <br />Deliverables shall be due within one month after the draft review meeting and shall include the final <br />versions of the deliverables listed under work item #6 above. <br />Consulting Services Agreement between City of San Leandro and 11/25/2015 <br />Architectural Resources Group, Inc. Exhibit A — Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.