Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Project Description: <br /> The City has a project to replace approximately 12,300 square yards of AC pavement at the Water Pollution <br /> Control Plant (WPCP) at 3000 Davis St, San Leandro, CA. Work will include new aggregate base as well <br /> regrading required to improve storm drainage and transitions to existing improvements. <br /> Additionally, the City has a project to create an equipment pad by partially filling an old polishing pond with <br /> earth that is currently stockpiled on site. <br /> Finally, the City is interested in documenting existing topography and grades on the north side of the slough <br /> that connects Davis Street with the San Francisco Bay for the purpose of determining work necessary to <br /> reduce the risk of Bay water overtopping the bank of the slough. <br /> Scope of Work: <br /> The Consultant shall prepare a topographic survey that will facilitate design of the new pavement, document <br /> the volume of soil in the stockpile, and document the height,width, and location of existing improvements along <br /> a portion of the north side of the slough. Areas to be surveyed are shown in figure 1. <br /> The Consultant's scope of work includes the following tasks: <br /> Task 1 —Preparatory Work <br /> 1) Review City provided information and attend an initial meeting with City staff in person or by phone <br /> to verify scope of work and project approach and to review any modifications that may result in cost <br /> saving. <br /> 2) Perform an overall site visit prior to start of work. <br /> 3) Perform general project administration. <br /> Task 2—Topographic Mapping <br /> 1) Measure topographic features such as top and toes of slopes, grade breaks and at intervals of <br /> approximately 25 feet. <br /> 2) Measure features within the project area such as curbs, walks, driveways, structures, trees, edges <br /> of pavement, edges of slabs, and high and low points. <br /> 3) Measure all utility structures within the project areas such as poles, manholes, catch basins, vaults, <br /> valves, meters, process facilities, and fire hydrants. <br /> 4) Provide underground field utility locating services for area of AC paving. Three 8-hours days are <br /> included for this task. <br /> Consulting Services Agreement between City of San Leandro and Towill, Inc. <br /> for WPCP AC Pavement Rehabilitation Exhibit A—Page 1 of 3 <br />