Laserfiche WebLink
Regulatory Mandates <br />•Citywide Speed Limit Certification ($70k DFSI funds) <br />•Survey vehicle speeds to confirm existing speed limits are within <br />State guidelines <br />•Periodic survey is required by State <br />•We have exhausted our time extensions <br />•Without current certification speed limits are unenforceable <br />•Bicycle and Pedestrian Master Plan Update ($70k Measure B <br />Bike and Ped funds) <br />•Update plan to reflect work installed to date <br />•Review current policies of Alameda County Transportation <br />Commission and update the plan as required <br />•Meet with Bicycle and Pedestrian Advisory Commission to receive <br />input on changes <br />•Required to continue to receive bike and ped funds from ACTC 6