My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2016 0105
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2016 0105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2017 10:09:22 AM
Creation date
3/1/2016 11:37:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
1/5/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0307 CSAmended+RGAmended
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0307
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Capital Project Update <br />printed December 17, 2015 <br />Allocation andPlanned <br />ItemDescriptionFunding SourceStatus Completion <br />$2,340,000 <br />Annual Overlay Rehab 2015-16 GF, Measure BB, Measure B, Gas <br />14Street surface replacementTaxDesignFall 2016 <br />$1,000,000 <br />Annual Street Sealing 2015-16 <br />15Street surface maintenance area 1 (North)Meas B and VRFDesignFall 2016 <br />$530,000 <br />HSIP Grant <br />Bancroft / Sybil signal improvements Measure B B&P <br />16Replace traffic signal DFSIDesignFall 2016 <br />$4,480,000 <br />Measure B project <br />East 14th / Hesperian / 150th Intersection General Fund <br />17Widen roadway to accommodate traffic turning lanesRDA successor agencyDesignSummer 2021 <br />$2,490,000 <br />East 14th Street Undergrounding (150th to Blossom) UG utility fees <br />18Relocate overhead utilities to UG and remove polesMeasure B LSRDesignSummer 2018 <br />$300,000 <br />Heron Bay Levee Maintenance <br />19Replace rip rap that protects Heron Bay levees.Heron Bay Assessment DistrictDesignFall 2017 <br />MacArthur/Superior Traffic Circle$120,000 <br />Design only of a traffic circle at the intersection of DFSI <br />20MacArthur and SuperiorGeneral fundDesignSummer 2016 <br />$2,650,000 <br />WPCP Dirt Relocation <br />21Relocate dirt generated by WPCP Rehabilitation projectWPCP Enterprise FundDesignFall 2017 <br />Annual Sidewalk Repair 2015-16$420,000 <br />Replace damaged portions of existing sidewalk, install <br />22ADA curb ramps.Meaure B and BB and TDA grantBid and AwardFall 2016 <br />$365,000 <br />Thrasher Park Play area and Fence HCD grant <br />23Replace play equipment and add protective fencePark Development FundBid and AwardSummer 2016 <br />$100,000 <br />Stenzel Park Bleachers <br />24Replace baseball bleachers at Stenzel ParkWW grantProcurementFall 2015 <br />$560,000 <br />Accessible Pedestrian Signal Upgrades 2012 Measure B B&P <br />Add ADA compliant pedestrian feedback equipment to 15 Freedom Grant <br />25existing traffic signals.TDA GrantConstructionWinter 2015-16 <br />San Leandro Ballpark Restroom $515,000 <br />Enlarge public restrooms to meet ADA by reducing size of <br />26team locker rooms.WW grantConstructionFall 2015 <br />Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.