My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2016 0307
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0307
>
8E Consent 2016 0307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:12:47 PM
Creation date
3/1/2016 11:38:26 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/7/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0307 CSAmended+RGAmended
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0307
Reso 2016-030
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: March 7, 2016 <br />Staff Report <br />Agenda Section:File Number:16-060 CONSENT CALENDAR <br />Agenda Number:8.E. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Accepting the Work for the Fiber Loop City Hall <br />to Main Library Project, Project No. 2013.0320 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends that the City Council accept the work and authorize the City Manager to file <br />the Notice of Completion, release the performance and payment bonds and release the <br />maintenance bond upon successful completion of the one-year maintenance period. <br />BACKGROUND <br />Prior to this project a single fiber cable connected City Hall with the Main Library and the rest <br />of the City’s fiber optic communication system. Damage to this link would sever <br />communication between the computer servers at City Hall and all other City facilities. This <br />project installed a second, separate, fiber optic line between City Hall and the Main library <br />creating a loop with the existing cable so that damage at one location will not stop <br />communications and data transfer. New conduit for the fiber was installed under the Fiber <br />Conduit for Broadband Network Project and the actual communication fiber was installed <br />under this project. <br />Analysis <br />Construction is complete. The work was inspected and deemed in compliance with the <br />contract documents and City standards. <br />Previous Actions <br />On April 20, 2015 by Resolution No. 2015-082, the City Council awarded a contract for <br />construction of the work to All Phase Excavation & Construction, Inc. <br />Page 1 City of San Leandro Printed on 3/1/2016
The URL can be used to link to this page
Your browser does not support the video tag.