My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 Pacheco Brothers Gardening Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 Pacheco Brothers Gardening Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 5:06:03 PM
Creation date
3/1/2016 5:06:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/1/2016
Retention
PERM
Document Relationships
Reso 2016-024
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bay Friendly Landscape Maintenance <br /> Trimming/maintenance of the Senior Community Center and two parking lots shall <br /> follow strict Bay Friendly maintenance guidelines. The City reserves the right to add <br /> bay friendly' plant material to any area and the contractor will be required to <br /> maintain them under these guidelines. <br /> Irrigation System Maintenance <br /> The City shall be responsible for all maintenance of the irrigation system including <br /> piping, wiring, spray heads, electric valves, and automatic controllers. The irrigation <br /> system shall be inspected by the Contractor on a bi-monthly basis during the <br /> irrigation period. Inspections shall be documented on format that will be provided <br /> by the City and provided to the City once completed. During these inspections <br /> the contractor shall adjust the water budget to ensure the amount of water being <br /> applied matches the needs of the plant material as closely as possible, while <br /> adhering to any watering restrictions in place. Contractor may be required to <br /> adjust the clocks as requested by the City. It is the Contractor's responsibility to <br /> insure that the system is operating correctly and that there is adequate coverage. <br /> Any failure on the part of the Contractor to reduce a water budget when <br /> requested to do so by the City will result in withholding of payment to cover <br /> excessive water bills for that particular area. All spray heads shall be kept cleaned <br /> and adjusted to maximize coverage with limited to no overspray or run-off onto <br /> hardscape. <br /> All irrigation parts and materials which are damaged or broken shall be reported <br /> to the City. Upon request, Contractor shall then submit in writing a written proposal <br /> for repair and/or replacement. A City representative shall then determine if work <br /> shall be done by Contractor or a City crew. Contractor is responsible for any <br /> damage caused by Contractor. For any repair work performed by the City, which <br /> is at fault by the Contractor, shall be charged against the Contractor's monthly <br /> account (Contractor shall have opportunity to perform repairs, which meet the <br /> City's irrigation standards, first). If the contractor agrees to perform extra irrigation <br /> work it must be performed within 48 hours of the request unless otherwise specified <br /> by the City and agreed to by the contractor. If the work is not performed within <br /> the agreed upon time frame the repair cost may be withheld from the monthly <br /> payments. This work normally includes broken sprinklers, lateral lines and <br /> occasionally mainlines. When lateral and mainline repairs are made, the City must <br /> be given the opportunity to inspect the work before it is covered up. If the City is <br /> not given the chance to inspect the work the contractor may have to uncover the <br /> work so that it can be inspected. <br /> Valves shall be kept well adjusted to insure efficient operation of the irrigation <br /> system. The Contractor shall also keep the controllers clean and free of insects and <br /> dust, and shall make any necessary repairs or replacements. <br /> RFP 55025 CITYWIDE LANDSCAPE MAINTENANCE Page 65 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.