Laserfiche WebLink
Precautions shall be taken to prevent water from wetting pedestrians, vehicles and <br /> pavement. Any soil washed onto pavement shall be cleaned up and any eroded <br /> areas shall be filled in at the Contractor's expense. <br /> Irrigation System Maintenance <br /> The City shall be responsible for all maintenance of the irrigation system including <br /> piping, wiring, spray heads, electric valves, and automatic controllers. The irrigation <br /> system shall be inspected by the Contractor on a bi-monthly basis during the <br /> irrigation period. Inspections shall be documented on format that will be provided <br /> by the City and provided to the City once completed. During these inspections <br /> the contractor shall adjust the water budget to ensure the amount of water being <br /> applied matches the needs of the plant material as closely as possible, while <br /> adhering to any watering restrictions in place. Contractor may be required to <br /> adjust the clocks as requested by the City. It is the Contractor's responsibility to <br /> insure that the system is operating correctly and that there is adequate coverage. <br /> Any failure on the part of the Contractor to reduce a water budget when <br /> requested to do so by the City will result in withholding of payment to cover <br /> excessive water bills for that particular area. All spray heads shall be kept cleaned <br /> and adjusted to maximize coverage with limited to no overspray or run-off onto <br /> hardscape. <br /> All irrigation parts and materials which are damaged or broken shall be reported <br /> to the City. Upon request, Contractor shall then submit in writing a written proposal <br /> for repair and/or replacement. A City representative shall then determine if work <br /> shall be done by Contractor or a City crew. Contractor is responsible for any <br /> damage caused by Contractor. For any repair work performed by the City, which <br /> is at fault by the Contractor, shall be charged against the Contractor's monthly <br /> account (Contractor shall have opportunity to perform repairs, which meet the <br /> City's irrigation standards, first). If the contractor agrees to perform extra irrigation <br /> work it must be performed within 48 hours of the request unless otherwise specified <br /> by the City and agreed to by the contractor. If the work is not performed within <br /> the agreed upon time frame the repair cost may be withheld from the monthly <br /> payments. This work normally includes broken sprinklers, lateral lines and <br /> occasionally mainlines. When lateral and mainline repairs are made, the City must <br /> be given the opportunity to inspect the work before it is covered up. If the City is <br /> not given the chance to inspect the work the contractor may have to uncover the <br /> work so that it can be inspected. <br /> Valves shall be kept well-adjusted to insure efficient operation of the irrigation <br /> system. The Contractor shall also keep the controllers clean and free of insects and <br /> dust, and shall make any necessary repairs or replacements. <br /> No modifications may be made to the existing automatic irrigation system without <br /> express approval of the City. Any changes so approved shall be noted by the <br /> Contractor on a copy of the Irrigation Plan and submitted to the City within five <br /> RFP 55026 CITYWIDE MEDIAN MAINTENANCE Page 59 of 75 <br />