Laserfiche WebLink
EXHIBIT A <br /> TECHNICAL SPECIFICATIONS <br /> GENERAL INFORMATION <br /> Work Schedule <br /> Contractor is to provide the City with a weekly work schedule describing when <br /> work is to be done at each location. <br /> The Contractor shall conduct all operations during the hours of 7:00 a.m. to 5:00 <br /> p.m. Monday through Friday, unless otherwise approved by the City. As noted in <br /> the bid tables, work at sites owned by the school district must be conducted <br /> between 7 AM and 8 AM. Contractor may not work on any Federal, State, or local <br /> holidays. The City reserves the right to change schedules for any reason, such as <br /> special events, or conflicts with adjacent property owners/tenants within five (5) <br /> working days advance notice. <br /> The Contractor shall provide sufficient personnel to perform all work in accordance <br /> with these specifications. Each work crew shall include at least one individual who <br /> speaks the English language proficiently. All contract employees are to adhere to <br /> basic Public Works standards for working attire including; uniform shirts with <br /> Contractor's name or logo clearly visible at all times when working at all locations, <br /> proper shoes and other gear required by State Safety Regulations. Shirts are to be <br /> maintained in a neat and presentable condition. All contractor vehicles are to <br /> have a readable sign with Contractor's name or logo and telephone number. <br /> Trucks are to be kept in a clean and presentable condition. The use of <br /> subcontractors in fulfilling the obligations of this contract is forbidden without prior <br /> written approval from the City. <br /> The Contractor will be expected to know the streets within the City of San Leandro <br /> so that work can be performed independently. <br /> Contractor is responsible for (a) having thoroughly investigated and considered <br /> the scope of services to be performed, (b) carefully considering how the services <br /> should be performed, and (c) fully understanding the facilities, difficulties, and <br /> restrictions attending the performance of the services required. Contractor is <br /> responsible to investigate each site and be fully acquainted with the conditions of <br /> each site. Should the Contractor discover any latent or unforeseeable conditions, <br /> which will materially affect the performance of services, Contractor shall <br /> immediately inform the City of such fact and shall not proceed except at <br /> Contractor's risk until written instructions are received from the City. <br /> RFP 55027 CITYWIDE TURF MAINTENANCE Page 51 of 63 <br />