Laserfiche WebLink
File Number: 16-024 <br />Change Order, Dry Rot Repair: $61,773.85 <br />Change Orders to address plumbing, <br />interior wall framing, add plywood <br />ceilings, and other misc. items: $38,185.31 <br />Total Contract Amount: $342,593.16 <br />The largest change order item cost was for rebuilding the front walls of the restroom and team <br />locker rooms, including siding and windows, resulting from extensive dry rot that was <br />discovered during the project’s demolition phase. <br />Total project cost is $516,000.00 including design, construction management, inspection, and <br />construction. <br />Budget Authority <br />This project is funded through the following appropriation: <br />·$558,659.90 from Measure WW Grant Funds in account 150-62-110, appropriated as <br />part of the FY 2013-14 budget. <br />ATTACHMENT(S) <br />None <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 3/15/2016