Current Fee Refer
<br />ence PROPOSED FEEDescription EXPLANATION
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)
<br />4 Plumbing Permit (Continued)
<br />Septic tank outfit complete ( installation or removal/abandonment), each $63.90 65.60$ CPI 2.6%
<br />Sewer extension, each $21.70 22.30$ CPI 2.6%
<br />Site sewer lateral between building and street main, new or repairs or
<br />abandonment
<br />$40.80 41.90$ CPI 2.6%
<br />Temporary privy or vault (chemical toilet), each $18.60 19.10$ CPI 2.6%
<br />Gray Water Systems (fee to cover review of plans and inspection of
<br />the installed system)
<br />$148.10 152.00$ CPI 2.6%
<br />Gas Piping and Oil Piping:
<br />Minimum Fee (one or two outlets)$7.50 7.70$ CPI 2.6%
<br />Exemption: Inspection of installation of an earthquake gas shutoff valve No minimum gas piping and oil piping fee
<br />Each gas outlet over two $4.20 4.40$ CPI 2.6%
<br />Each gas meter over one (same time and place)$5.50 5.70$ CPI 2.6%
<br />Gas line test, each test $15.00 15.40$ CPI 2.6%
<br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new
<br />tanks and piping to building, each
<br />$8.10 8.40$ CPI 2.6%
<br />Clothes dryer – residential, each $9.60 9.90$ CPI 2.6%
<br />Clothes dryer – commercial, each $11.70 12.00$ CPI 2.6%
<br />Hot Water systems, piping and equipment:
<br />Minimum fee (first device)$9.60 9.90$ CPI 2.6%
<br />Each additional device $12.20 12.60$ CPI 2.6%
<br />Boilers: All Sizes $77.10 79.10$ CPI 2.6%
<br />Solar system, including collectors, piping, tanks & exchanger, each system $49.90 51.20$ CPI 2.6%
<br />Energy Conservation: review of plans and/or energy forms for all buildings
<br />subject to the California Energy Commission’s conservation regulations
<br />(when not covered by building permit)
<br />Direct Cost (1) with a minimum charge of $64.00 $ 66.00 CPI 2.6%
<br />5 Heating, Ventilating and Air Condition or General Mechanical
<br />Filing and Issuance Fee 100.00$ CPI 2.6%
<br />Plan Check, when applicable Direct Cost (1)
<br />For new Residential Construction and additions with valuations over
<br />$100,000 including all HVAC, registers, ducts, gas line and vents.
<br />10% of Building Permit Fee Language in charge description modified
<br />Each register over two $3.10 3.20$ CPI 2.6%
<br />Heating, cooling and ventilating appliances:
<br />Gravity or forced air furnace, each (including gas fireplace inserts)$15.90 16.40$ CPI 2.6%
<br />Residential air conditioning system $13.30 14.30$ CPI 2.6%
<br />Unit heater, each $13.30 14.30$ CPI 2.6%
<br />Recessed wall heater, each $13.30 14.30$ CPI 2.6%
<br />Suspended space heater, each $13.30 14.30$ CPI 2.6%
<br />Gas range – domestic, each $9.60 9.90$ CPI 2.6%
<br />Gas range – commercial, each $11.70 12.00$ CPI 2.6%
<br />Gas clothes dryer, domestic, each $9.60 9.90$ CPI 2.6%
<br />Gas clothes dryer, commercial, each $11.70 12.00$ CPI 2.6%
<br />Gas domestic refrigerator, each $9.60 9.90$ CPI 2.6%
<br />Conversion burner, each $11.70 12.00$ CPI 2.6%
<br />Circulating type room heater, each $11.70 12.00$ CPI 2.6%
<br />Industrial and commercial heating equipment, each $16.40 16.90$ CPI 2.6%
<br />Alterations or changes of any control system or ventilating system from
<br />original installation
<br />$13.30 14.30$ CPI 2.6%
<br />Small burner of not over 15,000 BTU per hour, steam table sterilizers,
<br />laboratory burners, coffee urn burners, gas plates and similar devices, each
<br />$9.60 9.90$ CPI 2.6%
<br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs
<br />For steam or hot water heating piping and radiators, convectors, hot water panels, steam or hot water unit heaters, clothes pressing
<br />machines of any type, and all connection to industrial and processing equipment:
<br />For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system, including air inlet or outlet connections, registers
<br />and diffusers:
<br />$97.00 plus the amount shown for each heating, ventilating, and air
<br />conditioning item of work and each general mechanical item of work
<br /> 7
|