My WebLink
|
Help
|
About
|
Sign Out
Home
4C Public Hearing 2016 0502
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0502
>
4C Public Hearing 2016 0502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 1:19:30 PM
Creation date
4/27/2016 4:17:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0502 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0502
Reso 2016-047
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-135 <br />escalating operating costs are generally completed on an annual basis. <br />Attached to the resolution accompanying this report is the City of San Leandro Fee Schedule <br />that provides detail of current fees and adjustments, as well as the addition of 10 new fees: <br />·one each in Community Development Building, Community Development Planning, <br />Engineering and Transportation, and Fire Department, <br />·two in Public Works, and <br />·four in Recreation and Human Services <br />These new fees are shown in bold and italics. The proposed charges are in the right hand <br />column and are printed in bold and italics. <br />The following summarizes departmental changes to the fee schedule for 2016-17: <br />City Wide <br />·Legal services for paralegal time increased <br />Community Development <br />·Building Regulations: <br />o most fees are increased by the 2.6% CPI <br />o minimal description changes <br />o new fee for Non-residential re-roof <br /> <br />·Planning: <br />o fees increased by the 2.6% CPI <br />o minor description changes <br />o Clarification of referral to BZA fee <br />Engineering & Transportation <br />·Park facilities development impact fees increased based on the Engineering News Record <br />(ENR) construction cost index <br />·Overhead utility conversion increased by ENR for underground utilities factor <br />·Traffic division adjusted by ENR DFSI escalation factor <br />·New traffic calming service fee <br />Finance - no changes <br />Fire - increased fees by 2.6% CPI and changed Hazardous Materials Response and Other <br />Incident Fees to coincide with Alameda County fees <br />Library - no changes <br />Police - no changes <br />Public Works <br />·Four Equipment Rental fees changed <br />·Two new fees associated with Solid Waste and Recycling Receptacles <br />Page 2 City of San Leandro Printed on 4/26/2016
The URL can be used to link to this page
Your browser does not support the video tag.