Laserfiche WebLink
Regulatory Mandates <br />Citywide Speed limit Certification ($70k DFSI funds) <br />Survey vehicle speeds to confirm existing speed limits are within <br />State guidelines <br />Periodic survey is required by State <br />We have exhausted our time extensions <br />Without current certification speed limits are unenforceable <br />Bicycle and Pedestrian Master Plan Update ($70k Measure <br />BB local streets and roads) <br />Update plan to reflect work installed to date <br />F; Review current policies of Alameda County Transportation <br />Commission and update the plan as required <br />Meet with Bicycle and Pedestrian Advisory Commission to receive <br />input on changes <br />Required to continue to receive bike and ped funds from ACTC <br />