My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2016 0502
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0502
>
8F Consent 2016 0502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2016 1:23:09 PM
Creation date
4/27/2016 4:19:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/2/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0502 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0502
Reso 2016-052
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Resolution No. 2016 - <br /> <br />Attachment B <br />page 1 of 1 <br />TDA Article 3 Project Application Form <br />Fiscal Year of this Claim: FY 2016/17 Applicant: City of San Leandro <br />Contact person: Michael Stella, P.E., Principal Engineer <br />Mailing Address: 835 E. 14th Street, San Leandro, CA 94577 <br />E-Mail Address: mstella@sanleandro.org Telephone: 510-577-3433 <br />Secondary Contact (in event primary not available) Keith Cooke, Director of Engineering & Transportation <br />E-Mail Address: kcooke@sanleandro.org Telephone: 510-577-3439 <br />Short Title Description of Project: San Leandro Sidewalk Repair Program <br />Amount of claim: $72,426 <br />Functional Description of Project: <br />The project will provide for the design, procurement, construction and inspection of curb ramps, sidewalk bulb-outs, in-pavement lighted cross- <br />Walks, pedestrian safety signage, accessible pedestrian traffic signal equipment, and sidewalks at various locations throughout the City. <br /> <br /> <br />Financial Plan: <br />List the project elements for which TDA funding is being requested (e.g., planning, engineering, construction, contingency). Use the table below to <br />show the project budget for the phase being funded or total project. Include prior and proposed future funding of the project. Planning funds may <br />only be used for comprehensive bicycle and pedestrian plans. Project level planning is not an eligible use of TDA Article 3. <br /> <br />Project Elements: <br /> <br /> <br />Funding Source All Prior FYs Application FY Next FY Following FYs Totals <br />TDA Article 3 $72,426 $72,426 <br />list all other sources: <br />1. <br />2. <br />3. <br />4. <br />Totals $72,426 $72,426 <br /> <br />Project Eligibility: YES?/NO? <br />A. Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is <br />anticipated). <br />Yes <br />B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. Yes <br />C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California <br />Highway Design Manual? (Available on the internet via: http://www.dot.ca.gov). <br />N/A <br />D. Has the project been reviewed by a Bicycle Advisory Committee (BAC)? (If "NO," provide an explanation). Enter date the <br />project was reviewed by the BAC:________________________________ <br />No <br />E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been <br />evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that <br />include construction). <br />Project is <br />Categorically <br />Exempt <br />F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and <br />year) June 30, 2017 <br />Yes <br />G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such <br />maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: <br /> ) <br />Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.