My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2016-047
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2016
>
Reso 2016-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 6:56:33 PM
Creation date
5/5/2016 11:15:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/2/2016
Retention
PERM
Document Relationships
4C Public Hearing 2016 0502
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
View images
View plain text
Description Current Fee Reference <br /> ENGINEERING AND TRANSPORTATION DEPARTMENT <br /> 1 General Encroachment SLMC 5-1-225 <br /> ________________________________________ <br /> A.Permit .. ............................................................................................. $65.00 <br /> B.1 Inspection/Plan Review/Permit Issuance Direct Costs(1) <br /> B.2 Permit+Inspection Fee $215=$65(Permit)+$150(Inspection) <br /> (estimated inspection requirements=1.5 hours determined by City Engineer) <br /> C.Trench Damage/Penalty Fee $1.50/square ft.of trench for streets under 2 yrs.old <br /> $1.25/square ft.of trench for streets over 2 yrs.old <br /> D.Inspection/Security/Plan Review Deposit As determined by City Engineer to insure prompt,high quality repairs and to cover estimated <br /> inspection costs and plan review cost. <br /> E.No Permit Penalty Fee Double Inspection Fee and Permit Fee <br /> F.Sidewalk Inspection <br /> --100%Property Owner Work Cost of Work+15%of Cost of Work performed by City Contractor <br /> --Neighborhood Improvement Program 15%of costs of work performed by City Contractor <br /> --Annual Sidewalk Repair Program No Cost <br /> G.Agreement Direct Costs(1) <br /> H.Overhead Banner Installation and Removal $150.00 <br /> I.News rack Permit $55.00+$5.50 per news rack <br /> Maintenance Deposit $100.00+$5.00 per news rack <br /> 2 Subdivision: <br /> A.Parcel Map Waiver/Lot Line Adjustment/or Certificate of Compliance Direct Costs(1),$1,600 initial deposit <br /> B.Parcel Map Direct Costs(1),$4,000 plus$100 per lot initial deposit <br /> C.Tentative/Final Map Direct Costs(1) <br /> D.Subdivision Improvement Plan Review Direct Costs(1) <br /> 3 Building Permits: <br /> A.Plan Review Direct Costs(1);$55.00 minimum <br /> B.Agreement Preparation Direct Costs(1) <br /> 4 Large Format Copies(see also Community Development Dept.) $10.00 for first sheet and$2.00 for each sheet thereafter plus Direct Costs(1) <br /> 5 Park Facilities Development Impact Fees(2) SLMC 7.13.100 <br /> Park Land Acquisition Fee: <br /> Single Family $14,509.42 <br /> Multi-Family $12,681.94 <br /> Special Unit $6,341.61 <br /> Park Improvement Fee: <br /> Single Family $2,429.02 <br /> Multi-Family $2,123.42 <br /> Special Unit $1,061.73 <br /> Total Acquisition and Improvement Fee: <br /> Single Family $16,938.44 <br /> Multi-Family $14,805.36 <br /> Special Unit $7,403.34 <br /> 6 Grading Permits: <br /> A.Permit $55.00 <br /> B.Inspection Direct Costs(1) <br /> C.Inspection Deposit As determined by City Engineer <br /> D.Plan Review Direct Costs(1) <br /> 7 Public Works Projects: <br /> A.City Standard Plans(Printed or CD) $10.00 <br /> B.Bidder:City Projects Plans&Specification Documents purchased at City Hall Direct Costs(rounded to nearest$5)or a minimum of$25.00 <br /> C.Bidder:City Project Plans&Specification Documents purchased via mail Direct Costs(rounded to nearest$5)or a minimum of$25.00+mailing costs <br /> 8 Overhead Utility Conversion <br /> A. Residential Development Lesser of: Underground Utility District Master Plan <br /> i) Actual/estimated costs,or <br /> ii)$1,431.70 per dwelling unit <br /> B.Non-Residential Development Actual/estimated cost,approximately$358.25/LF <br /> 9 City Property Use Application Fee Direct Costs(1) <br /> (1) Direct Costs: Hourly personnel charge plus a factor of 33%for benefits,54%for indirect overhead charges and 87% for staffsupport charges. <br /> (2)Effective 815105 the Park Development Fees will be amended in accordance with Resolution 2005-069 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).