Laserfiche WebLink
Description Current Fee Reference <br /> FIRE SERVICE RELATED—GENERAL <br /> 1 Permits SLMC 3-3-112 <br /> A.Fire Code Permit Fees $241.00 <br /> 2 Sprinkler Fees jSLMC 3-3-260 <br /> A.Underground/Private Service Fire Main(includes plan review, $637.00 plus$15.40/hydrant or connection fee <br /> hydrostatic test,flush,&inspections<2) <br /> B.Sprinkler System(system=1 riser)(includes plan review,weld, $639.00 plus$0.55 per head <br /> hydrostatic test&inspections<2) <br /> C.Any extraordinary situations charged at 120.00/hr <br /> D.Automatic Sprinkler Tenant Improvements: <br /> Less than 20 heads $241.00 <br /> Greater than or equal to 20 heads $360.00 <br /> 3 Fixed Fire Protection System SLMC 3-3-250 <br /> A.Plan check,inspection and test $241.00 <br /> B.Electronics activation(clean agent,pre action,etc.) $360.00 plus$5 per device <br /> C.Any retest or re-inspection 1 $120.00/hr i <br /> 4 Fire Alarms ISLMC 3-3-250 <br /> A.Property rotection,plan check and test $241.00 plus$5 per device <br /> B.Life Safety Systems $120.00 plus$3/initiating and/or indicting device <br /> D.Any retest or re-inspection 1 $116.00/hr <br /> 5 Hazardous Materials Response and Other Incident Fees SLMC 3-3-300 <br /> A.En ine or Truck Com an $242.75/hr <br /> B.Deputy Chief $62.55/hr <br /> C.Battalion Chief 10926/hr <br /> 6 Inspection of Multiple Family Dwellings 3 or more units CA Health&Safety Code <br /> A.Annual Annual$120.00/hr(1) <br /> 7 Miscellaneous _ <br /> A.All other plan reviews(includes review and ordinary inspections 65%of bldg permit fee(2) <br /> associated with project) <br /> B.Other Fire Prevention Services(includes any miscellaneous fire Direct Cost(2)(3) <br /> protection related activities not otherwise categorized in this fee <br /> schedule <br /> C.Fire Investi ation Fee $601.00 <br /> 1 1 hour minimum <br /> 2 The City Manager and/or Fire Chief may adjust the plan checkin / ermit fee for an individual project when costs to the City are not congruent with this fee schedule. <br /> (3)Direct Cost=hourly personnel charge plus a factor of 100%for fringe benefits,overhead and indirect costs. <br /> 17 <br />