My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2016-047
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2016
>
Reso 2016-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 6:56:33 PM
Creation date
5/5/2016 11:15:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/2/2016
Retention
PERM
Document Relationships
4C Public Hearing 2016 0502
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description Current Fee Reference <br /> COMMUNITY DEVELOPMENT DEPARTMENT-Building Regulations Division(continued) <br /> 2 Building Permit (Continued) <br /> G.Plan Checking <br /> Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee <br /> and shall be as follows: <br /> (1)Residential Fire Sprinklers for 1&2 Family Dwelling New $527.00 flat fee to include plan review and inspection of <br /> Construction. Effective January 1,2011,fire sprinkler systems became residential fire sprinkler systems when installed in conjunction with <br /> mandatory in 1 and 2 family dwellings.The Division of Building and new 1&2 family dwelling construction. <br /> Safety will be reviewing and inspecting the installation of these systems. <br /> (2)In-house-During Regular Working Hours 80%of the building permit fee <br /> For Master Plans(i.e.identical buildings built by the same builder A full plan checking fee shall be paid for each Master Plan when <br /> on the same lot or in the same tract and for which building permits more than one building will be built and one half(50%)of the full <br /> are issues at the same time): plan checking fee shall be paid for each building at time of <br /> Changes,revisions,or additions to plans previously checked. Direct Cost 1 - 1 hour minimum charge <br /> Outside plan checking services as utilized at discretion of Building Same as for In-house-During Regular Working Hours <br /> Official. <br /> Additional Plan Review after the first recheck Direct Cost(1)-1 hour minimum per occurrence <br /> (3) In-house-outside of normal business hours when requested by Same as for In-house-During Regular Working Hours PLUS <br /> Applicant overtime and overhead charges <br /> (4) By Outside consultant,when requested by Applicant Equal to In-house-During Regular Working Hours PLUS <br /> Consultant's fee as established by Agreement(contract)between <br /> City and Consultant <br /> (5)Over the counter for small changes,revisions or additions,when Direct Cost(1),with minimum of one-half hour <br /> requested by applicant <br /> (6) Expedited Plan Check when requested by applicant&when plan Full plan check fee plus one and one-half times Direct Cost(1) <br /> reviewer is available <br /> (7) Phased Plan check-when the foundation or another part of the One and One-half(1-1/2)times the full plan check fee for the <br /> building needs approval and permit issuance prior to the whole building entire building <br /> (8) Alternate Methods and Materials Direct cost(1)1 hour minimum charge <br /> (9) Energy Conservation:for all buildings subject to the California 20%of Building Permits <br /> Energy Commission's conservation regulations <br /> (10)California Health&Safety Code(CHSC),section 18949.29 fee 5%of Building Permit Fee -For training and continuing <br /> applied to all projects requiring a"Building Permit". education required by the CHSC g 18949. <br /> 3 Electrical Permit <br /> A.Filing and Issuance $100 plus the amount shown below for each electrical item <br /> B. Plan-Check,when applicable Direct Cost 1 <br /> For Construction and additions with valuations over$100,000 including all 13%of building permit fees <br /> circuits,service and sub panels. <br /> Circuits: Installation,replacement or alteration of each electrical circuit(includes related outlets,switches,receptacle and lighting fixtures): <br /> All Electrical circuits $12.70 <br /> Trolley and plug-in ta bus-ways,per linear foot _ $0.70 <br /> Lighting fixtures,brackets,pendants,cord drops,outlets,receptacles, $1.50 <br /> switches and other lamp holding devices each on existing circuits <br /> Mufti-outlet assemblies,light tracts,per linear foot $1.30 <br /> Temporary power service pole or pedestal,each $31.40 <br /> Temporary distribution system(for construction sites,Xmas tree lots, $31.40 <br /> etc-),each <br /> Service or Service Change: <br /> Services over 600 volts: <br /> Up to 200 amp,each $11120 <br /> Over 200 amp,each $11120 <br /> Services 600 volts or less,each <br /> Up to 200 amp capacity $38.30 <br /> Over 200 amp capacity $76.60 <br /> 1 Direct Cost=hourly personnel charge plus a factor of 100%for frin a benefits,overhead and indirect costs <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.