Laserfiche WebLink
Description Current Fee Reference <br /> COMMUNITY DEVELOPMENT DEPARTMENT-Building Regulations Division(continued) <br /> 4 Plumbing Permit <br /> A.Filing and Issuance Fee $100.00 plus the amount shown below for each plumbing item <br /> B.Plan Check,when applicable Direct Cost(1) <br /> Exemption: Inspection of the installation of an earthquake gas shutoff valve $32.40 With No Filing&Issuance Fee <br /> For Construction&additions with valuations>$100,000 including all I16%of building permit fee <br /> water piping,gas piping,water heating&plumbing fixtures <br /> Plumbing fixture or waste discharge,each $12.50 <br /> Plumbing fixture removed and opening sealed,each $7.10 <br /> Plumbing fixture reset or set after the completion of the structure to an $9.40 <br /> outlet roughed in priorthereto each <br /> Repair or alteration of drainage or vent piping,each $14.30 <br /> Inside rain leader,each $9.40 <br /> Dishwasher-residential,each $9.40 <br /> Dishwasher-commercial,each $13.80 <br /> Garbage disposal-residential,each $9.40 <br /> Garbage disposal-commercial,each $13.30 <br /> Grease interceptor,each,up to 150 gal. $9.40 <br /> Grease interceptor,each,over 150 gal. $22.30 <br /> Industrial waste interceptor(sand,grease,oil/water separator,neutralizer $29.30 <br /> and clarifier)installation or removal,each <br /> Sewage ejector pump-residential,each $19.70 <br /> Sewage ejector pump-commercial,each $31.30 <br /> Water Piping: <br /> Water line and first 10 openings(including water using equipment $14.30 <br /> connected thereto) <br /> Each additional opening $2.00 <br /> Installation,replacement or abandonment of water service,each $14.30 <br /> Irrigation sprinkler system and first 20 heads $29.30 <br /> Each additional head $0.80 <br /> Inspection of Irrigation Controllers installed in sprinkler systems $5.90 <br /> Installation,alteration or repair of water piping and/or water treating or $14.30 <br /> using equipment,each <br /> Submeters Inspection $11.50 <br /> Water Heaters as or electric): <br /> Under 90 gallons,each $41.90 <br /> Over 90 gallons,each $83.90 <br /> T&P valve,each <br /> Flues: <br /> Minimum one or two flues $11.50 <br /> Each flue over two each $7.10 <br /> Vacuum Breakers or Back-flow Devices: <br /> Four or less $11.50 <br /> Each additional $3.20 <br /> Swimming Pools: <br /> Private,each $87.00 <br /> Public,each $144.40 <br /> In-ground spas,hot tubs and portable hot tubs $87.00 <br /> Sewers and Storm Drains: <br /> Storm drain or building sewer per 100 feet or fraction thereof $22.30 <br /> Building court connection to main sewer lateral,each $32.80 <br /> Building rainwater drains stems,complete,each $41.90 <br /> 1 Direct Cost=hourly personnel charge plus a factor of 100%for fringe benefits,overhead and indirect costs <br /> 7 <br />